2 Installation and commissioning
2.1. Introduction
47
3HAC026876-001 Revision: F
© Copyri
ght
200
7-2010 ABB.
All rights reserved.
2 Installation and commissioning
2.1. Introduction
General
This chapter contains information for installing the robot at the working site.
More detailed technical data can be found in the Product specification for the robot, such as:
•
load diagram
•
permitted extra loads (equipment)
•
location of extra loads (equipment).
Safety information
Before any installation work is commenced, it is extremely important that all safety
information is observed!
There are general safety aspects that must be read through, as well as more specific safety
information that describes the danger and safety risks when performing the procedures. Read
the chapter
before performing any installation work.
NOTE!
If the robot is connected to power, always make sure that the robot is connected to earth
before starting any installation work!
For more information see:
•
Product manual - IRC5
•
Product manual - IRC5 Compact
•
Product manual - Panel Mounted Controller
Содержание IRB 6640
Страница 2: ......
Страница 16: ...How to read the product manual 3HAC026876 001 Revision F 14 Copyright 2007 2010 ABB All rights reserved ...
Страница 438: ...4363HAC026876 001 Revision F Copyright 2007 2010 ABB All rights reserved ...
Страница 439: ......
Страница 440: ...ABB Robotics S 721 68 VÄSTERÅS SWEDEN Telephone 46 0 21 344000 3HAC 026876 001 Revision F en ...