2 Installation and commissioning
2.9.2. Commissioning (Foundry Prime)
3HAC026876-001 Revision: F
110
© Copyri
ght
200
7-2010 ABB.
All rights reserved.
2.9.2. Commissioning (Foundry Prime)
General
The following should be taken in consideration when running a robot in a water jet
application cell:
CAUTION!
Never switch off the overpressure in motors and serial measurement compartment during
cooling down of robot after it has been switched off.
NOTE!
To reduce the risk for corrosion due to condensation in gearboxes, it is recommendable that
the robot is running with high speed on each axes at least on one occasion each hour. This is
to lubricate the gearbox cavities.
NOTE!
When turning off a cleaning cell we recommend that the humid air is ventilated out from the
cell, to avoid that the humid air is sucked into gearboxes for example, due to the raised
vacuum when cooled down.
Содержание IRB 6640
Страница 2: ......
Страница 16: ...How to read the product manual 3HAC026876 001 Revision F 14 Copyright 2007 2010 ABB All rights reserved ...
Страница 438: ...4363HAC026876 001 Revision F Copyright 2007 2010 ABB All rights reserved ...
Страница 439: ......
Страница 440: ...ABB Robotics S 721 68 VÄSTERÅS SWEDEN Telephone 46 0 21 344000 3HAC 026876 001 Revision F en ...