
Refitting the cable harness
Use this procedure to refit the cable harness.
Note
Action
xx1000000386
Apply
Sikaflex 521FC
on the
cover
(at the
SMB/BU units) mounted on the cable har-
ness, before the harness is fitted in the
hole
in the frame.
1
Parts:
•
A: Hole (for cover)
•
B: Sikaflex 521FC
•
C: Cover
See section
•
Replacing motor axis 2 on page 346
Refit
motor axis 2
.
2
See section
•
Replacing cable harness, axes 1-
6 on page 222
Refit the lower end of the
cable harness
.
3
Concluding refitting procedure
Use this procedure for the concluding procedure of refitting.
Note
Action
See section
•
Changing oil, axis-2 gearbox on
page 173
Fill gearbox axis 2 with oil.
1
Calibration is detailed in a separate calib-
ration manual enclosed with the calibra-
tion tools.
Recalibrate the robot.
2
General calibration information is included
in section
.
DANGER
Make sure all safety requirements are met
when performing the first test run. These
are further detailed in the section
run may cause injury or damage on page 29
.
3
418
Product manual - IRB 6640 Foundry Prime
3HAC040586-001 Revision: N
© Copyright 2011-2018 ABB. All rights reserved.
4 Repair
4.7.2 Replacing gearbox axis 2
Continued
Содержание IRB 6640 Foundry Prime
Страница 1: ...ROBOTICS Product manual IRB 6640 Foundry Prime ...
Страница 2: ...Trace back information Workspace R18 1 version a9 Checked in 2018 03 22 Skribenta version 5 2 025 ...
Страница 18: ...This page is intentionally left blank ...
Страница 118: ...This page is intentionally left blank ...
Страница 438: ...This page is intentionally left blank ...
Страница 448: ...This page is intentionally left blank ...
Страница 456: ...This page is intentionally left blank ...
Страница 486: ...This page is intentionally left blank ...
Страница 488: ...This page is intentionally left blank ...
Страница 495: ......