Note/Illustration
Action
Note!
The tilthouse is movable, be
careful not to damage it!
Make sure the cabling lies freely inside the
upper arm. Then lift the upper arm while
feeding the cabling from inside the arm.
14
Refitting, upper arm
The procedure below details how to refit the upper arm to the robot.
Note/Illustration
Action
DANGER
Turn off all electric power, hydraulic and
pneumatic pressure supplies to the robot!
1
CAUTION
The complete upper arm weighs 23 kg without
any additional equipment fitted! Use a suitable
lifting device to avoid injury to personnel!
2
Spare part no. is specified in
.
xx0600002602
Make sure that the
sealing rings
are fitted
properly in the upper arm, facing the flat sur-
face outwards! Replace them if any damage
is detected!
3
Sealing rings
xx0500002549
Fit the lifting equipment to the upper arm ac-
cording to the figure to the right.
Note!
The tilthouse is movable, be careful not
to damage it!
4
Art. no. is specified in
Lubricate the mounting holes of the upper arm
with
grease
.
5
Insert the cabling into the upper arm while
placing the arm into mounting position.
6
Continues on next page
146
3HAC026048-001 Revision: E
© Copyright 2006-2013 ABB. All rights reserved.
4 Repair
4.4.3 Replacement of complete upper arm
Continued
Содержание IRB 260
Страница 1: ...ABB Robotics Product manual IRB 260 ...
Страница 2: ...Trace back information Workspace R13 1 version a6 Checked in 2013 03 31 Skribenta version 1184 ...
Страница 8: ...This page is intentionally left blank ...
Страница 52: ...This page is intentionally left blank ...
Страница 110: ...This page is intentionally left blank ...
Страница 206: ...This page is intentionally left blank ...
Страница 214: ...This page is intentionally left blank ...
Страница 216: ...This page is intentionally left blank ...
Страница 260: ...This page is intentionally left blank ...
Страница 266: ......
Страница 267: ......