Note/Illustration
Action
Gently pull down the cable harness
through the lower arm and remove it from
the robot.
12
Refitting, cable unit axis 6
The procedure below details how to refit the cable unit of axis 6 to the robot.
Note/Illustration
Action
DANGER
Turn off all electric power, hydraulic and
pneumatic pressure supplies to the robot!
1
Insert the lower part of the cable unit through
the frame, into the base.
2
Connect the connectors R1.MP4-6 and
R2.BU4-6 to the base. Also connect the
customer cables and the air hose.
3
Connect the earth cables.
4
xx0200000400
Connect the connector R2.FB4-6 to the
SMB-unit, connector R2.SMB3-6 (B).
5
R2.SMB
R2.SMB3-6
R2.SMB1-4
xx0200000398
Refit the SMB unit to the bracket by tighten-
ing the nuts (D).
Reconnect the battery cable (A), if discon-
nected.
6
Continues on next page
126
3HAC026048-001 Revision: E
© Copyright 2006-2013 ABB. All rights reserved.
4 Repair
4.3.2 Replacement of cable unit, axis 6
Continued
Содержание IRB 260
Страница 1: ...ABB Robotics Product manual IRB 260 ...
Страница 2: ...Trace back information Workspace R13 1 version a6 Checked in 2013 03 31 Skribenta version 1184 ...
Страница 8: ...This page is intentionally left blank ...
Страница 52: ...This page is intentionally left blank ...
Страница 110: ...This page is intentionally left blank ...
Страница 206: ...This page is intentionally left blank ...
Страница 214: ...This page is intentionally left blank ...
Страница 216: ...This page is intentionally left blank ...
Страница 260: ...This page is intentionally left blank ...
Страница 266: ......
Страница 267: ......