Note
Action
If the robot is to be calibrated with fine
calibration:
Remove all external cable packages
(DressPack) and tools from the robot.
Removing the motor with pulley
Preparations before removing the axis-5 motor, pulley or shaft
Note
Action
Decide which calibration routine to use, and take
actions accordingly prior to beginning the repair
procedure.
1
xx1300002581
Jog all axes to zero position.
2
DANGER
Turn off all:
•
electric power supply
•
hydraulic pressure supply
•
air pressure supply
to the robot, before entering the robot working
area.
3
CAUTION
For robots with protection type Clean Room
For robots with food grade lubrication
For robots with protection type Hygienic
Always cut the paint with a knife and grind the
paint edge when disassembling parts of the robot!
See
Cut the paint or surface on the robot before
4
Continues on next page
760
Product manual - IRB 1200
3HAC046983-001 Revision: S
© Copyright 2014 - 2021 ABB. All rights reserved.
4 Repair
4.6.7 Replacing the axis-5 motor with pulley
Continued
Содержание IRB 1200
Страница 1: ...ROBOTICS Product manual IRB 1200 ...
Страница 2: ...Trace back information Workspace 21D version a15 Checked in 2021 12 16 Skribenta version 5 4 005 ...
Страница 156: ...This page is intentionally left blank ...
Страница 896: ...This page is intentionally left blank ...
Страница 898: ...This page is intentionally left blank ...
Страница 905: ......