Operation Manual / A150-M56/66/57/67 - A155-M..
9 Dismantling and fitting, general / 9.2 Material required
© Copyright 2021 ABB. All rights reserved.
HZTL4032_EN
Rev.Q
January 2021
9.2
Material required
Customer spare part set
Before starting operations, make sure the required customer spare part set is available (see
chapter
).
Customer tool set
Before starting work, make sure the required tool set is available (see chapter
).
Not all tools are marked with a part number. Identification is guaranteed by the tool list. This
list is enclosed with the tool set.
WARNING
Servicing the tools
The tools must be checked for damage before and after use.
u
Visually inspect for corrosion, cracks, deformation and wear.
u
Damaged tools must no longer be used and must be replaced.
Swivel lifting eyes
Swivel lifting eyes are required for the safe lifting of loads, which are not supplied by ABB.
Fig. 37: Swivel lifting eyes
Product
Thread M
Length L [mm]
Minimum load limit [kg]
Quantity
A150
M8
M16
13 mm
21 mm
75 kg
1000 kg
3
2
A155
M8
M16
13 mm
21 mm
150 kg
1400 kg
3
2
Table 36: Swivel lifting eyes
Press-off screws
Six press-off screws (01) are required to press off the gas outlet flange, which are not sup-
plied by ABB.
Page
86
/
194
Содержание HT604450
Страница 2: ......