Installation
20 - EN
ProcessMaster / HygienicMaster
CI/FEP300/FEH300-EN
3.6
Preparing and routing the signal and magnet coil cable
Cut to length and terminate both cables as shown.
Important
Use wire end sleeves.
• Wire end sleeves 0.75 mm
2
(AWG 19), for shielding (S1, S2)
• Wire end sleeves 0.5 mm
2
(AWG 20), for all other wires
The shields may not touch (signal short circuit).
Fig. 23: Sensor side, dimensions in mm (inch)
Fig. 24: Transmitter side, dimensions in mm (inch)
L
1
max. stripped length = 105 (4.10)
1
Measurement potential 3, green
L2 = 70 (2.76)
2
Signal line E1, violet
L2 = 60 (2.36)
3
Shield 1S
L2 = 60 (2.36)
4
Shield 2S
L2 = 60 (2.36)
5
Signal line, E2, blue
L2 = 60 (2.36)
6
Data line, D2, yellow
L2 = 70 (2.76)
7
Data line, D1, orange
L2 = 70 (2.76)
8
Magnet coil, M2, red
L2 = 90 (3.54)
9
Magnet coil, M1, brown
L2 = 90 (3.54)
10
Groundwire, steel
11
SE clamp
Содержание HART FEH300
Страница 2: ......
Страница 39: ...Appendix CI FEP300 FEH300 EN ProcessMaster HygienicMaster EN 37 ...
Страница 40: ...Appendix 38 EN ProcessMaster HygienicMaster CI FEP300 FEH300 EN ...
Страница 41: ......