![ABB GOE(2) Скачать руководство пользователя страница 18](http://html.mh-extra.com/html/abb/goe-2/goe-2_installation-and-commissioning-manual_5362018.webp)
18
Installation and commissioning guide
1ZSC000563-ACF EN, REV. A, 2020-06-25
4.3 Preparations
4.3.1 Installation of lifting tools
Overview
G001931
1
Lifting tool
30 Soft bedding, e.g. rubber mat or woodboard
31 Shackle
Procedure
1.
Loosen the M8 bolts (24).
NOTE!
It is not necessary to remove the
M8 bolts.