ABB eVD4 Скачать руководство пользователя страница 46

If no frames are received during 2xTAL, that is, if at least two consecutive frames
are lost, the receiver defines the quality of the whole received data set as "bad" and
sets the input value to the default, that is, to fail-safe. Consider this when designing
the application. For example, the IEDs should use an enabling signal for
interlocking purposes, and a blocking-type signal for protection purposes. By this
way, a fail-safe functionality is ensured.

5.5.2 

Default value handling

The information is of point-to-point type which means that there is only one signal
connected to the function block input. The default value of the input, FALSE (0), is
taken into use when there is a communication error on the receiver side. If one IED
application function block input receives several signals from several IEDs, the
input value is calculated in OR or AND operation from several inputs. In this case,
one default signal is treated as logical FALSE (0), but the other signals can keep
the function block input value active. It works similarly as copper cables connected
between IEDs having no detection of single data loss. In all cases, however, a
separate alarm event is always generated by the GSEGGIO1.Alm data object for
IEC 61850 event clients.

GSEGGIO1.Alm can also be used on the application side as an input in the Signal
Matrix Tool's Binary Outputs sheet (signal GSEGGIO ALARM). Thereby it is
possible to, for example, change the setting group in case one or several IEDs are
disconnected from the network.

5.5.3 

Alarm supervision in application

In a communication time-out situation, all the peer IEDs receive information about
the problem. The system does not tolerate single failures or non-existing devices,
for example, in service situations. Take this into account when designing an
application.

Disable GOOSE sending by writing “false” from IEC 61850 clients
to the GoEna attribute under the GOOSE control block. Use this
feature carefully, and for test purposes only.

5.5.4 

Diagnostic counters

The IEC 61850 data model of the 615 series IEDs includes a logical node
LD0.GSEGGIO1 for the GOOSE communication diagnostic. The counters are also
available via the HMI or PCM600 path 

Monitoring/I/O Status/Communication/

GSEGGIO1

.

It is possible to reset the counters via 

Monitoring/I/O Status/Communication/

GSEGGIO1/Monitoring/Reset counters

 and via the IEC 61850 communication

by writing 

True

 to the GSEGGIO1.RstCnt.Oper.ctlVal data attribute.

Section 5

1MRS757255 B

GOOSE

38

Breaker Integrated Protection RBX615

Engineering Guide

Содержание eVD4

Страница 1: ...Equipped with Relion technology eVD4 Breaker Integrated Protection RBX615 Engineering Guide...

Страница 2: ......

Страница 3: ...Document ID 1MRS757255 Issued 2011 12 13 Revision B Product version 2 0 Copyright 2011 ABB All rights reserved...

Страница 4: ...losed only in accordance with the terms of such license Trademarks ABB and Relion are registered trademarks of the ABB Group All other brand or product names mentioned in this document may be trademar...

Страница 5: ...roduct failure would create a risk for harm to property or persons including but not limited to personal injuries or death shall be the sole responsibility of the person or entity applying the equipme...

Страница 6: ...Conformity The IED is designed in accordance with the international standards of the IEC 60255 series EMC Directive 2004 108 EC and MV circuit breaker standard IEC 62271 100...

Страница 7: ...ons must always be followed The frames of the IED and of the HMI have to be carefully earthed When the plug in unit has been detached from the docking unit do not touch the inside of the DU The IED DU...

Страница 8: ......

Страница 9: ...horizontal communication 16 Predefined vertical communication data sets 17 Vertical communication diagnostic counters 17 Parameter setting and disturbance recorder 18 Section 5 GOOSE 19 Horizontal co...

Страница 10: ...supervision 37 Background sending 37 Default value handling 38 Alarm supervision in application 38 Diagnostic counters 38 Section 6 Required CCT600 project modifications 41 Attaching the IEC 61850 cl...

Страница 11: ...hase and during normal service For more details on tool usage see the PCM600 documentation 1 2 Intended audience This manual addresses the system engineers and installation and commissioning personnel...

Страница 12: ...Figure 1 The intended use of manuals in different lifecycles The engineering manual contains instructions on how to engineer the IEDs using the different tools in PCM600 The manual provides instructi...

Страница 13: ...descriptions and setting guidelines sorted per function The manual can be used to find out when and for what purpose a typical protection function can be used The manual can also be used when calcula...

Страница 14: ...ugh warning hazards are related to personal injury it is necessary to understand that under certain operational conditions operation of damaged equipment may result in degraded process performance lea...

Страница 15: ...and disabled with the Operation setting Parameter values are indicated with quotation marks The corresponding parameter values are On and Off IED input output messages and monitored data names are sh...

Страница 16: ...8...

Страница 17: ...els Requirements 6 Configuration description language for communication in electrical substations related to IEDs Impact on engineering 7 1 7 4 Basic communication structure for substation and feeder...

Страница 18: ...ation of these technologies provide a broad range of features from mainstream communication standard parts 8 1 9 2 Therefore IEC 61850 is also open for possible new communication concepts in the futur...

Страница 19: ...0 station communication files can be exported from PCM600 to the station engineering tools for engineering of station communication between the bay IEDs and station IEDs A PC with PCM600 can be connec...

Страница 20: ...n addition to other products supporting the connectivity concept the connectivity packages for PCM600 contain a description of IED s internal parameters and their properties such as data format unit s...

Страница 21: ...and event reporting properties CCT600 acts as a system tool which is used to define and share the system wide 61850 parameters such as communication addresses horizontal communication data and its pri...

Страница 22: ...14...

Страница 23: ...ata offered by the 615 series IEDs can be modelled according to IEC 61850 and the services for using the data are widely supported according to the standard Process data monitoring of status informati...

Страница 24: ...IEC 61850 communication configuration such as data sets report control blocks GOOSE control blocks and the setting group control block are always located under LD0 LLN0 The full data model is found i...

Страница 25: ...lues at faults MeasFlt measurements The 615 series supports both buffered and unbuffered reporting The default report control blocks in configuration are buffered A single data set can only be used by...

Страница 26: ...er of active client connections To reset the vertical communication diagnostic counters write true to RstCnt Oper ctlVal attribute under MMSGGIO1 GOOSE communication has its own diagonstic counters 4...

Страница 27: ...he application to handle a received GOOSE message and to send the concerned data back to the network is with the 615 series IEDs below 3 ms The response time fulfils the tightest Type 1A Class P2 3 re...

Страница 28: ...ocess 5 2 GOOSE publishing properties GOOSE data is sent periodically in 802 1Q multicast frames over a LAN Via the LAN the peer devices know the state of the communication When the data changes the G...

Страница 29: ...0 Check the GOOSE Control block GoID name according to the system requirements of the receiving device Although the 615 series IEDs use MAC address and APPID for receiving packet detection some device...

Страница 30: ...xport Private Sections check box The private sections data of the SCL file is only required by COM600 or MicroSCADA not by CCT600 GUID 220A10FD 5961 4ED6 9698 FCCC5E0EF6A8 V1 EN Figure 6 Export option...

Страница 31: ...To select the destination folder for the project click Browse 5 Click OK After creating an empty project import the SCD file from PCM600 to the project 5 3 3 Importing the SCD file Import the SCD file...

Страница 32: ...wse for File GUID AF950D43 2962 4D40 9834 3EF5E26C246E V1 EN Figure 9 Browsing for an SCL file 3 Locate the SCL file and click Open 4 Click Import File The project now includes the configuration accor...

Страница 33: ...single binary double binary integer and floating point data values with a quality attribute A quality attribute is used at the receiver side to check data validity 5 3 4 1 Creating a GOOSE data set De...

Страница 34: ...set and control block for GOOSE service If the IED sends also analog values it is recommended to use a separate data set and control block for analog values After creating the GOOSE data sets define...

Страница 35: ...the tool proposes by default A full list of the available signals with descriptions and IEC 61850 names is available in a file in the connectivity package installation directory such as C Program File...

Страница 36: ...r each GoCB in the system Recommendation is to define a device specific value and not to use a default empty value Configuration Revision Contains an integer value that sent in every GOOSE message The...

Страница 37: ...0C CD 01 00 00 01 0C CD 01 01 FF VLAN ID The VLAN identifier can be used if the Ethernet switches in a station bus support VLAN If static VLAN IDs are defined it affects also to switch port configura...

Страница 38: ...ator window 2 In the IEC 61850 Data Engineering window on the right select the Goose Control Engineering tab 3 To configure the GOOSE data connections between the IEDs drag the data receiving IED from...

Страница 39: ...F09F5 0917 4990 8AF3 002B2D875B8C V1 EN Figure 17 GOOSE inputs show under the Inputs submenu 5 Repeat the drag and drop operation for every IED receiving data from the selected GOOSE control block Del...

Страница 40: ...UID 52150B11 1100 4D0F 83F4 6E44BECEC7BF V1 EN Figure 19 Exporting an SCD file 2 Click Browse to select the file destination and click OK The tool proposes its project location for the SCD file and it...

Страница 41: ...options 4 Click Export 5 3 6 2 Importing the SCL file 1 Open PCM600 2 Go to the Project Explorer view and select the Plant Structure tab 3 Right click the project and select Import 1MRS757255 B Secti...

Страница 42: ...4 Open the SCL file exported from CCT600 5 In the SCL Import Options dialog box under IED Types select Don t import IEDs of unknown type if the GOOSE configuration does not include third party device...

Страница 43: ...cting GOOSE inputs to an IED application 1 In PCM600 open the Project Explorer and select the Plant Structure tab 2 Add the GOOSERCV function block by using Application Configuration Tool The GOOSERCV...

Страница 44: ...ssible subscriber input point GUID D0C421D1 7DB3 4ECA 858A 4FEB17C863D0 V2 EN Figure 24 GOOSE sheet in Signal Matrix Tool If the data type does not match with the GOOSERCV function block the attribute...

Страница 45: ...y attribute the receiver IED input object is not updated according to the received status value if the data quality is bad questionable or blocked The default value is also used in this case 5 5 GOOSE...

Страница 46: ...ways generated by the GSEGGIO1 Alm data object for IEC 61850 event clients GSEGGIO1 Alm can also be used on the application side as an input in the Signal Matrix Tool s Binary Outputs sheet signal GSE...

Страница 47: ...peer IED time outs Intln8 Received ConfRev mismatches When increasing there is a mismatch between the received GOOSE frame information and the used GOOSE configuration Intln9 Received frames with Need...

Страница 48: ...GUID 261D823E C0F6 44D3 AEA4 A3F3BC447107 V1 EN Figure 25 Receiving GOOSE data in 615 series IEDs Section 5 1MRS757255 B GOOSE 40 Breaker Integrated Protection RBX615 Engineering Guide...

Страница 49: ...bnetwork in communication section view Attach the new client to report control blocks Keep the IEC 61850 event reporting configuration consistent with the CCT600 project 1 Create the bus connections f...

Страница 50: ...N Figure 26 Defining bus connection properties for IEC 61850 clients 3 Repeat the procedure for all five clients of the project Section 6 1MRS757255 B Required CCT600 project modifications 42 Breaker...

Страница 51: ...w the event clients appear under LD0 LLN0 for every report control block update the data flow from the tool GUID 270775BC 0707 4E6A B1C4 62CF3BB10F50 V1 EN Figure 27 IEC 61850 event reporting clients...

Страница 52: ...D509B9C0 2D87 4DAC AAC5 4F63E7E62AD9 V1 EN Figure 28 Defining server IEDs in CCT600 Section 6 1MRS757255 B Required CCT600 project modifications 44 Breaker Integrated Protection RBX615 Engineering Gu...

Страница 53: ...r systems Defined by the IEEE Standard CT Current transformer CTRL Control logical device DR Disturbance recorder DU Docking unit EMC Electromagnetic compatibility Ethernet A standard for connecting a...

Страница 54: ...ction and Control IED Manager SCADA Supervision control and data acquisition SCD Substation configuration description SCL XML based substation description configuration language defined by IEC 61850 s...

Страница 55: ...47...

Страница 56: ...Dalmine Italy Phone 39 035 6952 111 Fax 39 035 6952 874 E Mail sacetms tipm it abb com www abb com ABB Oy Distribution Automation P O Box 699 FI 65101 VAASA Finland Phone 358 10 22 11 Fax 358 10 22 41...

Отзывы: