Prepare Switchgear Compartment
1. Before modifying the switchgear compartment, de-energize/switch off the breaker. If the
circuit breaker is ON and the springs are charged, to turn it off, press the OPEN button on
the circuit breaker fascia, and ensure that the circuit breaker contacts are open.
2. Inspect the compartment for damage, rework .
Figure 16
Prepare AKD-6—Compartment
3. Check cabinet for suitability of Retrofill.
4. Check each breaker compartment for bolted joints in the primary disconnect bars. Where
such joints exist, check the bolts for tightness.
5. Inside the compartment, check the contact areas on each primary disconnect bar or
cluster of fingers for foreign matter that may have accumulated. Clean those areas if
necessary with a clean, lint-free rag and isopropyl alcohol or acetone.
Be sure to apply a thin film of D50HD38 (Mobilgrease 28) to the contact areas for better
electrical connections inside the compartment
AKD-6— 3200A/4000A Compartment
22 ©2022 Emax 2 Retrofill Circuit Breakers 800A-4000A
2TSA451014P0000 Rev-B
Figure 17