![ABB EasyLine Series Скачать руководство пользователя страница 87](http://html1.mh-extra.com/html/abb/easyline-series/easyline-series_instructions-for-installation-start-up-and-operation_3695418087.webp)
Installing the Gas Analyzer
87
Electrical Connections Modbus Module
RS232 Interface
Pin Signal
2 RxD
3 TxD
5 GND
Design: 9-pole male Sub-D plug
RS485 Interface
Pin Signal
2 RTxD–
3 RTxD+
5 GND
Design: 9-pole female Sub-D plug
NOTE
For detailed Information on "Modbus", refer to the Technical Information
"EL3000, EL3060, EL3010-C – Modbus".