
3.3.2 Preventive inspection, DressPack upper arm
Location of DressPack upper arm
The figure shows the cable package IRBDP SW2 UE.
xx0800000086
Tension arm unit
A
Ball joint housing (tension arm unit)
B
Process cable package, upper arm
C
Ball joint housing (process cable support axis 6)
D
Process cable support axis 6
E
Continues on next page
200
Product manual - DressPack/SpotPack IRB 6640
3HAC028638-001 Revision: K
© Copyright 2007-2018 ABB. All rights reserved.
3 Maintenance
3.3.2 Preventive inspection, DressPack upper arm
Содержание DressPack IRB 6640
Страница 1: ...ROBOTICS Product manual DressPack SpotPack IRB 6640 ...
Страница 2: ...Trace back information Workspace R18 1 version a9 Checked in 2018 03 22 Skribenta version 5 2 025 ...
Страница 8: ...This page is intentionally left blank ...
Страница 18: ...This page is intentionally left blank ...
Страница 44: ...This page is intentionally left blank ...
Страница 194: ...This page is intentionally left blank ...
Страница 220: ...This page is intentionally left blank ...
Страница 324: ...This page is intentionally left blank ...
Страница 338: ...This page is intentionally left blank ...
Страница 364: ...This page is intentionally left blank ...
Страница 366: ...This page is intentionally left blank ...
Страница 369: ......