Modifications reserved
Page 24/79
4.2.3
Sea freight cases (wooden box)
Perform the following steps to unpack the UPS equipment from the sea freight package:
1.
Disassemble the wooden box by removing all screws.
2.
Remove the plastic film and bag from the UPS by cutting it, taking care not to damage the
cabinet; the edges are not protected.
3.
Remove the accessories from their location. The standard set of accessories is: user manual,
2x painted sockets, screws, 4x feet and keys.
4.
Tear out the 2x humidity absorbers. One is inside the front part of the UPS: open the door using
the keys to remove the absorber. The second absorber is at the back.
1)
2)
Fig 4.2.3-1: Sea freight cases unpacking sequence (Wooden box)
Содержание DPA UPScale ST120
Страница 1: ... Copyright 2017 ABB All rights reserved User Manual DPA UPScaleTM ST S2 10 200 kW ...
Страница 76: ...Modifications reserved Page 76 79 10 Attachments 10 1 Technical data sheet ...
Страница 78: ......
Страница 79: ... Copyright 2017 ABB All rights reserved Technical data sheet DPA UPScaleTM ST S2 10 200 kW ...
Страница 104: ......
Страница 105: ... Copyright 2017 ABB All rights reserved Technical data sheet DPA UPScaleTM ST S2 10 200 kW ...