
Section-1
04-3006_S1_OPM_ABB_DPA_UPSCALE_RI_10-80kW_EN_150316.doc
Page 12/52 ABB
Modifications reserved
1.4.3 UNPACKING
Unpack the equipment by removing the packing and shipping materials. Make a visual inspection and check that
’Tip&Tel’ indicator ( "FRAGILE" and "ARROW") on the packing container is intact.
Perform the following steps to unpack the UPS equipment from the pallet and make sure that the floor surface is
solid and suitable for the wheeling and heavy weight:
(1)
Cut wrappers and remove packing container by pulling it upwards;
(2)
Remove the plastic cover from the UPS;
(3)
Remove pallet from the UPS;
Retain the packaging materials for future shipment of the UPS;
Examine the UPS for any sign of damage. Notify your carrier or supplier immediately if damage is
apparent.
(4a) Open the UPS-door and make sure that all the UPS-Modules are appropriately fitted in their UPS-
Compartment and if the UPS system is provided
(4b) Without a UPS-module make sure that the empty UPS-compartment is correctly covered with the UPS-
compartment protection cover.
By unpacking the equipment from the wooden case remove all screws.
Bottom screws
Sides screws
!
KG
HEAVY !
3
1
1
2
4
Содержание DPA Upscale M 10
Страница 27: ......
Страница 28: ......
Страница 29: ......
Страница 31: ......
Страница 32: ......
Страница 33: ......
Страница 35: ......
Страница 36: ......
Страница 37: ......
Страница 39: ......
Страница 40: ......
Страница 41: ......
Страница 43: ......
Страница 44: ......
Страница 45: ......
Страница 47: ......
Страница 48: ......
Страница 49: ......
Страница 51: ......
Страница 52: ......
Страница 53: ......