
5.3.8 Replacing the axis-5 to axis-6 transition cabling
Location of the cable harness
The cable harness is located as shown in the figure.
xx2100000091
Summary of the replacement procedure
This is a brief summary of the replacement procedure, containing the major actions
to be performed.
1 Remove the tubular cover.
2 Separate the cabling between the tubular and the tilt (at the axis-4 joint unit).
3 Remove the tilt and place on a workbench.
4 Remove the axis-6 joint unit.
5 Remove the axis-5 cover.
6 Remove the axis-5 joint unit. Move the cabling from old to new joint unit.
7 Replace the axis-5 to axis-6 transition cabling.
Replacing the axis-5 to axis-6 transition cabling
The replacement procedure is identical to replacing the axis-5 joint unit.
Follow procedure
Replacing the axis-5 joint unit and the axis-5 to axis-6 transition
.
Product manual - CRB 15000
487
3HAC077389-001 Revision: L
© Copyright 2021 - 2023 ABB. All rights reserved.
5 Repair
5.3.8 Replacing the axis-5 to axis-6 transition cabling
Содержание CRB 15000
Страница 1: ...ROBOTICS Product manual CRB 15000 ...
Страница 2: ...Trace back information Workspace 23B version a17 Checked in 2023 06 29 Skribenta version 5 5 019 ...
Страница 8: ...This page is intentionally left blank ...
Страница 16: ...This page is intentionally left blank ...
Страница 38: ...This page is intentionally left blank ...
Страница 54: ...This page is intentionally left blank ...
Страница 182: ...This page is intentionally left blank ...
Страница 200: ...This page is intentionally left blank ...
Страница 1058: ...This page is intentionally left blank ...
Страница 1076: ...This page is intentionally left blank ...
Страница 1095: ......