Index
1. Description . . . . . . . . . . . . . . . . . . . . . . . 5
1.1.
General characteristics . . . . . . . . . . . . . . . . . 5
External front view of the circuit-breaker . . . . . . . . 5
Rating plate . . . . . . . . . . . . . . . . . . . . . . . 5
Circuit-breaker rating plate . . . . . . . . . . . . . . . 5
Moving part construction characteristics . . . . . . . . 6
Fixed part construction characteristics . . . . . . . . . 6
Checking on receipt . . . . . . . . . . . . . . . . . . . 7
Storage, lifting and weights . . . . . . . . . . . . . . . 7
4. Installation . . . . . . . . . . . . . . . . . . . . . . . . 8
4.1.
Installation room. . . . . . . . . . . . . . . . . . . . . 8
Installation of the fixed circuit-breaker . . . . . . . . . 8
Preparation of the fixed part . . . . . . . . . . . . . . 8
Installation of the fixed part (Fig. 12) . . . . . . . . . . 9
Electrical connections . . . . . . . . . . . . . . . . . 10
Connections to the power circuit . . . . . . . . . . . 10
Shapes of the terminals . . . . . . . . . . . . . . . . 10
Assembly procedure for the connection busbars . . . 11
5.2. Earthing . . . . . . . . . . . . . . . . . . . . . . . . 11
5.3.
Wiring the circuit-breaker auxiliary circuits . . . . . . 11
Interfacing elements for fixed circuit-breakers . . . . 11
Withdrawable circuit-breaker . . . . . . . . . . . . . 12
Putting into service . . . . . . . . . . . . . . . . . . 14
General procedures . . . . . . . . . . . . . . . . . . 14
Instructions for use . . . . . . . . . . . . . . . . . . 15
Operating and signalling parts . . . . . . . . . . . . 15
Circuit-breaker closing and opening procedures . . . 16
Racking-in/out operation . . . . . . . . . . . . . . . 17
Maintenance programme . . . . . . . . . . . . . . . 19
Circuit-breaker life. . . . . . . . . . . . . . . . . . . 19
Maintenance program . . . . . . . . . . . . . . . . . 19
First level maintenance operations . . . . . . . . . . 19
Preliminary operations: . . . . . . . . . . . . . . . . 19
Checks and general cleaning:. . . . . . . . . . . . . 19
Dismantling tab and cap . . . . . . . . . . . . . . . 20
Mechanical control . . . . . . . . . . . . . . . . . . 21
Electrical and mechanical accessories . . . . . . . . 21
Protection releases . . . . . . . . . . . . . . . . . . 21
Test with Ekip Connect (optional) . . . . . . . . . . . 21
Maintenance operations; final checks. . . . . . . . . 22
8.3.10. Interlock . . . . . . . . . . . . . . . . . . . . . . . . 22
8.4.
Second level maintenance operations . . . . . . . . 22
Preliminary operations: . . . . . . . . . . . . . . . . 22
General checks and cleaning:. . . . . . . . . . . . . 22
Dismantling the tab, cap and arcing chambers . . . . 23
Mechanical control . . . . . . . . . . . . . . . . . . 24
Electrical and mechanical accessories . . . . . . . . 24
Checking contact wear . . . . . . . . . . . . . . . . 25
Protection releases . . . . . . . . . . . . . . . . . . 25
Test with Ekip Connect (optional) . . . . . . . . . . . 25
Maintenance operations; final checks: . . . . . . . . 26
Measures to be taken for any operating anomalies . . 27
10. Accessories . . . . . . . . . . . . . . . . . . . . . . 28
10.1.
Electrical accessories . . . . . . . . . . . . . . . . . 28
Mechanical locks . . . . . . . . . . . . . . . . . . . 30
Notes for Emax LTT Low Temperature accessories. . 31
Spare parts and retrofitting . . . . . . . . . . . . . . 31
Protection releases - General notes. . . . . . . . . . 32
Notes for dielectric stiffness tests. . . . . . . . . . . 32
Abbreviations and notes . . . . . . . . . . . . . . . 33
SACE PR122/VF Release - Identification . . . . . . . 34
12.1. General . . . . . . . . . . . . . . . . . . . . . . . . 34
12.1.1.
Main Features . . . . . . . . . . . . . . . . . . . . . 34
Standard Reference . . . . . . . . . . . . . . . . . . 34
Operation condition . . . . . . . . . . . . . . . . . . 34
User Interface . . . . . . . . . . . . . . . . . . . . . 35
Push Button . . . . . . . . . . . . . . . . . . . . . . 37
Rating plug . . . . . . . . . . . . . . . . . . . . . . 37
Optional Module. . . . . . . . . . . . . . . . . . . . 37
External Module . . . . . . . . . . . . . . . . . . . . 37
User Menu. . . . . . . . . . . . . . . . . . . . . . . 37
Main Area . . . . . . . . . . . . . . . . . . . . . . . 38
Menu Area . . . . . . . . . . . . . . . . . . . . . . . 38
About this section . . . . . . . . . . . . . . . . . . . 45
Ekip T&P. . . . . . . . . . . . . . . . . . . . . . . . 47
B2342
Emax VF
3/66
Doc. No
Model
Apparatus
Scale
Page No
1SDH000909R0001
Содержание B2204
Страница 62: ...B2342 Emax VF 62 66 Doc no Model Apparatus Scale Page No 1SDH000909R0001 Signalling contacts ...
Страница 65: ......