Installation
44
One (1) CSU con-
nected
If there is one (1) CSU connected to the CSU input X1, 21 then set the DIP
switch 1 to position ON.
Two (2) CSU con-
nected
If there are two (2) CSUs connected to the CSU input 21 and 22 then set the
DIP switch 1 and 2 to position ON.
Note!
The CSU cable is connected before configuration is made.
For more information how to connect CSU cables, see the chapter “Con-
necting CSU cable” on page - 34.
O
N
1 2
3 4 5 6 7 8
O
N
1 2
3 4 5 6 7 8
Содержание Arc Guard System TVOC-2
Страница 1: ...Arc Guard System TVOC 2 Installation and maintenance guide ...
Страница 2: ......
Страница 8: ...6 ...
Страница 10: ...About Arc Guard System 8 ...
Страница 18: ...Arc Monitor functions 16 Overview of Arc Monitor The Arc Monitor consists of 7 8 11 12 13 9 10 6 5 4 3 2 1 ...
Страница 54: ...Installation 52 ...
Страница 74: ...Human Machine Interface functions 72 ...
Страница 82: ...Technical data 80 ...
Страница 89: ......