Advant
®
Controller 450 User’s Guide
Section 2.6.7 Power-up Ahead of Program Loading
3BSE 002 415R701 Rev A
2-91
6.
The processor module changes over and indicates P1 (working mode OPERATION).
The system is now started and ready for operation.
Perform the final stages, including start of application program execution, successively.
WARNING
When the application program is started, the process being controlled is
influenced.
Significant engineering tool commands to use are:
1.
DIsable Build Mode, DIBM PCx
2.
DeBLock, DBL.
Verification
Make functional tests, including process functions, applicable.
2.6.7 Power-up Ahead of Program Loading
1.
Set the mode selector on Processor Module PM511 in 3 (CLEAR) position.
Repeat for an eventually redundant processor module.
2.
Switch on the circuit breaker S1 on the power switch unit(s) in any order.
(If this circuit breaker has been used to switch off the power supply to the system.)
Several power switch and distribution units can exist in the controller cabinet or in
adjacent I/O cabinets.
3.
Check for the following positive indications of a successful power-up:
–
Distribution Unit SX554
green LED LIVE (24 V)
–
Regulator SR511
green LED 5 V
–
Backup Power Supply SB511 (or 510)
green LED RUN
–
S100 I/O Bus Extenders DSBC 174 or DSBC 176
green LEDs RUN
and DC OK
–
Processor Module PM511
green LED RUN
display ind. P2
(Indicating working mode CONFIGURATION.)
–
Redundant Processor Module PM511 (BACKUP)
green LED RUN
display ind. b2...b1
(The backup unit starts in working mode b2, UPGRADING. After a while (
<
90s)
there is a transition to b1, STANDBY).
If a redundant processor module is available, and if both modules’ start mode
selectors are set in 3 (CLEAR) position, then the left processor module will be
PRIMARY while the right processor module will be BACKUP.
explains alternative ways of starting.
See
.
Содержание Advant Controller 450
Страница 1: ...Advant OCS with Master software GYDQW RQWUROOHU User s Guide 3BSE 002 415R701 Rev A ...
Страница 26: ...Advant Controller 450 User s Guide Table of Contents 3BSE 002 415R701 Rev A xvi ...
Страница 30: ...Advant Controller 450 User s Guide Table of Contents 3BSE 002 415R701 Rev A xx ...
Страница 488: ... GYDQW RQWUROOHU 8VHU V XLGH SSHQGL DUGZDUH 0RGXOHV A 48 3BSE 002 415R701 Rev A ...
Страница 496: ...Advant Controller 450 User s Guide Appendix C Delivery Documentation C 2 3BSE 002 415R701 Rev A ...
Страница 508: ...Advant Controller 450 User s Guide Appendix D Item Designations D 12 3BSE 002 415R701 Rev A ...
Страница 514: ...Advant Controller 450 User s Guide Appendix E Current Consumption and Heat Dissipation E 6 3BSE 002 415R701 Rev A ...
Страница 518: ...Advant Controller 450 User s Guide Appendix F Load Calculation F 4 3BSE 002 415R701 Rev A ...
Страница 522: ...Advant Controller 450 User s Guide Appendix G Memory Calculation G 4 3BSE 002 415R701 Rev A ...
Страница 528: ...Advant Controller 450 User s Guide Appendix H Halt Codes H 6 3BSE 002 415R701 Rev A ...
Страница 561: ...Advant Controller 450 User s Guide Index 3BSE 002 415R701 Rev A iii V Valve control 1 102 VT100 terminal 1 105 ...
Страница 562: ...Advant Controller 450 User s Guide Index iv 3BSE 002 415R701 Rev A ...
Страница 563: ......
Страница 564: ...3BSE 002 415R701 Rev A March 2000 ...