■
Connection procedure
WARNING!
See and obey the safety instructions of the converter. If you ignore them, injury or
death, or damage to the equipment can occur.
WARNING!
Apply grease to stripped aluminum conductors before attaching them to non-coated
aluminum cable lugs. Obey the grease manufacturer’s instructions.
Aluminum-aluminum contact can cause oxidation in the contact surfaces.
1. Grid connection terminals are located in the plinth of the converter. Fasten the grid cables
to the grid connection terminals. Connect the phase conductors to terminals L1, L2 and
L3. Tighten the conductors to 120 N·m (89 lbf·ft).
2. Connect ground conductors or cables to the cabinet PEN (ground) busbar.
3. Provide support for the connections whenever necessary.
4. Refit all shrouds (if any) removed earlier.
Electrical installation 63
11
Содержание ACS880-87LC-3200A
Страница 1: ... ABB WIND TURBINE CONVERTERS ACS880 87LC 3200A 3200A 7 wind turbine converters Hardware manual ...
Страница 2: ......
Страница 4: ......
Страница 10: ...10 ...
Страница 18: ...5 1 3 4 6 8 7 2 18 Safety instructions ...
Страница 48: ...48 ...
Страница 68: ...68 ...
Страница 75: ...b 3 a 2 6 c 4 Air flow direction is towards the converter module Maintenance 75 ...
Страница 85: ...14 Open the installation stand optional and place it in front of the module 14 Maintenance 85 ...
Страница 108: ...108 ...
Страница 112: ...Description CAN bus connection XCAN XCAN 112 BCU x5 control unit ...
Страница 116: ...116 Dimension drawings ...
Страница 117: ...Dimension drawings 117 ...
Страница 118: ...118 Dimension drawings ...
Страница 130: ...130 ...