Unpacking
Unpack the wind turbine converter when you have moved the converter to its final installation
location, or near it.
1. Cut the attachment clamps with side cutters and pull them away.
2. Remove the fastening screws/nails/rivets and unpack the converter from the wooden
package.
3. Cut the plastic covering the converter with a carpet knife and remove it.
4. Detach the converter from its platform, lift the converter and remove the platform.
Lifting the converter
Obey these instructions when ABB lifting bars are in use:
1. Attach the lifting slings to holes of the lifting bars (a). Use long enough slings. See the
minimum lifting angle in the figure below.
WARNING!
Divide the weight to all lifting bars and all holes. If you do not divide the load
evenly, the lifting bars can not carry the weight of the converter.
2. Tighten the slings steadily and make sure that the load is evenly divided.
3. Lift steadily.
4. Position the converter as near its final position as possible.
5. Remove the lifting bars and refasten the roof bolts to retain the degree of protection of
the cabinet. Store the loose lifting bars for later use.
a
44 Mechanical installation
4
Содержание ACS880-87LC-3200A
Страница 1: ... ABB WIND TURBINE CONVERTERS ACS880 87LC 3200A 3200A 7 wind turbine converters Hardware manual ...
Страница 2: ......
Страница 4: ......
Страница 10: ...10 ...
Страница 18: ...5 1 3 4 6 8 7 2 18 Safety instructions ...
Страница 48: ...48 ...
Страница 68: ...68 ...
Страница 75: ...b 3 a 2 6 c 4 Air flow direction is towards the converter module Maintenance 75 ...
Страница 85: ...14 Open the installation stand optional and place it in front of the module 14 Maintenance 85 ...
Страница 108: ...108 ...
Страница 112: ...Description CAN bus connection XCAN XCAN 112 BCU x5 control unit ...
Страница 116: ...116 Dimension drawings ...
Страница 117: ...Dimension drawings 117 ...
Страница 118: ...118 Dimension drawings ...
Страница 130: ...130 ...