Operation principle and hardware description 39
See also
•
firmware manual for parameter settings
•
Wiring the thermistor relay(s) (oL505 and +2L505)
on page
•
circuit diagrams delivered with the drive for the actual wiring.
Pt100 relays (o2L506, +3L506, +5L506, +8L506)
What the option contains
The standard Pt100 relay option includes two (+2L506), three (+3L506), five (+5L506) or
eight (+8L506) Pt100 temperature monitoring relays and an auxiliary relay wired to a
terminal block. Other numbers of Pt100 relays must be ordered as application engineered.
Description
A Pt100 relay is used for overtemperature supervision of motors equipped with Pt100
sensors. For example, three sensors measure the temperature of the motor windings and
two sensors the temperature of the bearings. The sensor resistance increases linearly as
the temperature rises. The relay releases at an adjustable wake-up level and indicates
motor overtemperature through its change-over contact.
The relay provides connection terminals for one Pt100 temperature sensor and terminals
of one normally open and one normally closed contact.
The customer connects Pt100 sensors to the Pt100 relays (one sensor per relay) and the
auxiliary relays of the normally open contacts of the Pt100 relays, for example, to
•
main breaker control circuit of the drive for opening the breaker in case of motor
overtemperature or
•
appropriate digital input of the drive for tripping the drive and generating a fault
message in case of motor overtemperature or
•
customer control circuit.
Содержание ACS880-07XT Series
Страница 1: ...ABB industrial drives Hardware manual ACS880 07XT drives 400 to 1200 kW ...
Страница 4: ......
Страница 12: ...12 ...
Страница 20: ...20 Safety instructions ...
Страница 26: ...26 Introduction to the manual ...
Страница 47: ...Mechanical installation 47 Moving the crate with a forklift Free width for fork tines 750 mm 29 5 ...
Страница 54: ...54 Mechanical installation ...
Страница 89: ...Electrical installation 89 PE 11 8 4 9 11 ...
Страница 94: ...94 Electrical installation ...
Страница 110: ...110 Start up Test and validate the operation of Prevention of unexpected start with FSO xx option Q950 Action ...
Страница 112: ...112 Fault tracing ...
Страница 123: ...Maintenance 123 5 6 7 ...
Страница 124: ...124 Maintenance 8 10 9 ...
Страница 126: ...126 Maintenance 6 5 4 ...
Страница 127: ...Maintenance 127 9 8 7 ...
Страница 128: ...128 Maintenance 12 11 10 ...
Страница 149: ...Dimensions 149 Dimension drawing examples Frame 2 R11 R10 with brake chopper ...
Страница 150: ...150 Dimensions Frame 2 R11 R10 without brake chopper ...
Страница 153: ...Dimensions 153 Location of input terminals ACS880 07XT 12 pulse ...
Страница 154: ...154 Dimensions Location of output terminals ACS880 07XT R10 with du dt ...
Страница 155: ...Dimensions 155 Location of output terminals ACS880 07XT R10 without du dt ...
Страница 156: ...156 Dimensions Location of output terminals ACS880 07XT R11 with du dt ...
Страница 157: ...Dimensions 157 Location of output terminals ACS880 07XT R11 without du dt ...
Страница 158: ...158 Dimensions Location of PE terminals ACS880 07XT ...
Страница 159: ...Dimensions 159 Location of resistor terminals ACS880 07XT R10 ...
Страница 160: ...160 Dimensions Location of resistor terminals ACS880 07XT R11 ...
Страница 168: ...www abb com drives www abb com drivespartners 3ABD00043579 Rev C EN 2018 01 01 Contact us ...