![ABB ACS850 series Скачать руководство пользователя страница 77](http://html.mh-extra.com/html/abb/acs850-series/acs850-series_manual_2316077.webp)
Program features 77
A “boost” function is also available for the activation of the timers: a signal source can
be selected to extend the activation time for a parameter-adjustable time period.
Settings
Parameter group
(page
DC voltage control
Overvoltage control
Overvoltage control of the intermediate DC link is needed with two-quadrant line-side
converters when the motor operates within the generating quadrant. To prevent the
DC voltage from exceeding the overvoltage control limit, the overvoltage controller
automatically decreases the generating torque when the limit is reached.
Undervoltage control
If the incoming supply voltage is cut off, the drive will continue to operate by utilizing
the kinetic energy of the rotating motor. The drive will be fully operational as long as
the motor rotates and generates energy to the drive. The drive can continue the
operation after the break if the main contactor remained closed.
Timer active
Timer enable signal
Boost signal
Boost time
Содержание ACS850 series
Страница 1: ...ACS850 Firmware Manual ACS850 Standard Control Program ...
Страница 4: ......
Страница 56: ...56 Control locations and operating modes ...
Страница 262: ...262 Parameters ...
Страница 310: ...310 Fault tracing ...
Страница 348: ...348 Control through a fieldbus adapter ...
Страница 358: ...358 Drive to drive link ...
Страница 368: ...368 Control chain and drive logic diagrams ...