96 Operation
When the drive is put into service after it has been commissioned, or after it has been
taken out of service for maintenance or troubleshooting, check the drive according to the
following list:
•
Check that no tools and foreign objects are left inside the cabinets.
•
Check that all auxiliary power supplies from external sources are switched on.
•
Check that all internal circuit breakers of the drive are closed.
•
Check that all grounding devices are removed
•
Check that all covers are mounted and the doors are closed, locked and / or bolted.
•
Check that the MCB is in
operating
position.
•
Check that there is no run interlock active.
Starting the drive from remote
When the drive is operated from remote through a higher-level control system or an
operator control desk, follow the instructions in the appropriate manuals.
Starting the drive locally
5. Press the
SUPPLY ON
pushbutton to connect the drive to the main power supply. The
following takes place:
•
The MCB closes.
•
The DC link charges.
While the DC link charges, the
SUPPLY ON
pushbutton flashes. As soon as the DC
link is charged, the
SUPPLY ON
pushbutton changes to a permanent light.
Содержание ACS580MV
Страница 1: ...ABB industrial drives Hardware manual ACS580MV drives 200 kW to 6300 kW 6 kV to 11 kV...
Страница 4: ......
Страница 10: ...10...
Страница 50: ...50 Control system and interfaces...
Страница 52: ...52 Guidelines for planning the electrical installation...
Страница 77: ...Electrical installation 77 Power cable entry from top 1 screen extensions to ground 1...
Страница 90: ...90 Installation checklist...
Страница 125: ...Maintenance 125 5 Disconnect the fiber optic links from the power module 1 Hoist 2 screw M8X20 1 2...
Страница 127: ...Maintenance 127 stops it again 10 Connect the second lifting belts to the lifting eyes provided on the power module...
Страница 142: ...142 Maintenance...
Страница 144: ......
Страница 146: ...Contact us 2UBB004520 Rev E EN 2019 06 27 www abb com drives www abb com drivespartners...