![ABB ACS580MV Скачать руководство пользователя страница 81](http://html1.mh-extra.com/html/abb/acs580mv/acs580mv_hardware-manual_3348342081.webp)
Electrical installation 81
Preparing the cables
1. Remove the grommets.
2. To ensure proper sealing, cut along the marking that corresponds to the cable
diameter. Slide the grommet onto the cable. The grommet must fit tightly to prevent
water from entering the cabinet.
3. If necessary, remove the entry plate and pull the cables through the entry holes.
4. Loosen the screws of the EMC cushion brackets and push the cushions apart (arrow).
5. Remove the cable insulation at the point of entry (1).
If the outer cable screen is non-conductive, cut open the cable screen in the middle of
the stripped area (1). To turn the conductive side inside out, pull the cable screen ends
over the cable insulation (2). Connect the screens ends with a continuous conducting
foil (3).
Содержание ACS580MV
Страница 1: ...ABB industrial drives Hardware manual ACS580MV drives 200 kW to 6300 kW 6 kV to 11 kV...
Страница 4: ......
Страница 10: ...10...
Страница 50: ...50 Control system and interfaces...
Страница 52: ...52 Guidelines for planning the electrical installation...
Страница 77: ...Electrical installation 77 Power cable entry from top 1 screen extensions to ground 1...
Страница 90: ...90 Installation checklist...
Страница 125: ...Maintenance 125 5 Disconnect the fiber optic links from the power module 1 Hoist 2 screw M8X20 1 2...
Страница 127: ...Maintenance 127 stops it again 10 Connect the second lifting belts to the lifting eyes provided on the power module...
Страница 142: ...142 Maintenance...
Страница 144: ......
Страница 146: ...Contact us 2UBB004520 Rev E EN 2019 06 27 www abb com drives www abb com drivespartners...