132 Maintenance
In order to ensure reliable drive operation, replace the power modules according to the
maintenance interval table.
Reforming capacitors of the power modules
Power modules that are used as spare parts must be installed and operated in a drive
every 2 years in order to reform the capacitors and thus reduce the risk of a potential
hazard.
Testing main power supply circuit
The main power supply circuit must be tested regularly according to the preventive
maintenance interval table. The tests consist of the actuation and checking of proper
reaction of
•
Emergency stop
•
MCB door button (Main power supply OFF and ON)
•
Panel stop
•
customer specific devices
Replacing the control panel battery
The battery is housed on the rear of the control panel. Replace with a new battery. Dispose
the old battery according to local disposal rules or applicable laws.
ACS-AP-X assistant control panels user’s manual
.
Circuit board replacements
Control unit (BCU) and memory unit (ZMU)
To locate the BCU see figure
Control compartment with open swing frame
on page
.
NOTICE
Electrostatic discharge (ESD) can damage electronic boards and components.
Do not touch printed circuit boards or other sensitive components without applying
static-sensitive handling precautions!
Do not touch the components without wearing ESD protection device.
Put the board or component on a grounded working surface protected against
electrostatic discharges.
Hold a board only at the edge.
Handle a faulty board as carefully as a new one.
NOTICE
Any electrical board replacement must be done after power is off. Only qualified
electricians are allowed to carry out electrical parts replacement.
Содержание ACS580MV
Страница 1: ...ABB industrial drives Hardware manual ACS580MV drives 200 kW to 6300 kW 6 kV to 11 kV...
Страница 4: ......
Страница 10: ...10...
Страница 50: ...50 Control system and interfaces...
Страница 52: ...52 Guidelines for planning the electrical installation...
Страница 77: ...Electrical installation 77 Power cable entry from top 1 screen extensions to ground 1...
Страница 90: ...90 Installation checklist...
Страница 125: ...Maintenance 125 5 Disconnect the fiber optic links from the power module 1 Hoist 2 screw M8X20 1 2...
Страница 127: ...Maintenance 127 stops it again 10 Connect the second lifting belts to the lifting eyes provided on the power module...
Страница 142: ...142 Maintenance...
Страница 144: ......
Страница 146: ...Contact us 2UBB004520 Rev E EN 2019 06 27 www abb com drives www abb com drivespartners...