Maintenance 103
For details on using the local control panel, see User’s Manual “
De-energizing the drive
1. Stop the drive following the instructions in Chapter
2. Set the local control panel to local control mode by pressing the
Loc/Rem
key (1)
3. Press the
SUPPLY OFF
pushbutton to disconnect the drive from the main power
supply. The following takes place:
•
The MCB opens.
•
The DC link discharges.
While the DC link discharges, the
SUPPLY OFF
pushbutton flashes.
•
Wait 15 minutes until the DC link capacitors have discharged completely (the delay
time is triggered when the main power feeder is disconnected).
DANGER
Hazardous voltages!
For work in the medium voltage circuit of the drive the connection of grounding
equipment at the appropriate locations is a must. The grounding equipment ensures
that hazardous voltages cannot be fed into the drive neither from the main power supply
nor the motor.
1
Содержание ACS580MV
Страница 1: ...ABB industrial drives Hardware manual ACS580MV drives 200 kW to 6300 kW 6 kV to 11 kV...
Страница 4: ......
Страница 10: ...10...
Страница 50: ...50 Control system and interfaces...
Страница 52: ...52 Guidelines for planning the electrical installation...
Страница 77: ...Electrical installation 77 Power cable entry from top 1 screen extensions to ground 1...
Страница 90: ...90 Installation checklist...
Страница 125: ...Maintenance 125 5 Disconnect the fiber optic links from the power module 1 Hoist 2 screw M8X20 1 2...
Страница 127: ...Maintenance 127 stops it again 10 Connect the second lifting belts to the lifting eyes provided on the power module...
Страница 142: ...142 Maintenance...
Страница 144: ......
Страница 146: ...Contact us 2UBB004520 Rev E EN 2019 06 27 www abb com drives www abb com drivespartners...