34 Standard Commissioning Process
3. Inform customer send remote MCB close/open CMD, and measure voltage as below
table. The values should not be higher than 5V.
Remote MB CMD drawing
Other checking items
Before energizing the Auxiliary supply for the first time, proceed as follows:
1. Make sure that all auxiliary switches, optional circuit breakers and protection switches
inside the drive have been switched off.
2. Before turning on the fuses and breakers, measure the incoming auxiliary voltage and
control voltage, verifying that it is /- 10% of the rated value.
Probe+
Probe-
AC
DC
X1:42
PE
< 5V
< 5V
X1:44
PE
< 5V
< 5V
X1:46
PE
< 5V
< 5V
X1:48
PE
< 5V
< 5V
X1:50
PE
< 5V
< 5V
X1:52
PE
< 5V
< 5V
Содержание ACS580MV
Страница 1: ... ABB INDUSTRIAL DRIVES ACS580MV Commissioning Manual 200kW to 6300 kW 3 3kV to 11 kV ...
Страница 4: ......
Страница 8: ...8 ...
Страница 43: ...Standard Commissioning Process 43 Press the button Load SW and wait till update is finished ...
Страница 45: ...Standard Commissioning Process 45 In this step should select Lab Tools Standalone Installation ...
Страница 60: ...60 Standard Commissioning Process Complete the installation press Finish ...
Страница 83: ...Standard Commissioning Process 83 ...
Страница 96: ...96 Standard Commissioning Process ...
Страница 121: ...Option 121 IO signals ...
Страница 122: ...122 Option Panel control interface System fault ...
Страница 140: ...140 Option ...
Страница 148: ...148 Preventive Maintenance ...