18 Standard Commissioning Process
Scope of delivery
After receiving the converter and related equipment, the customer is asked to check all
items against the bill of material and shipping damages. Missing parts should then have
been reported immediately to the carrier and the project responsible ABB organization. All
claims for damage should have been made to the carrier and ABB should have been
notified.
To avoid unnecessary delay of the commissioning, the commissioning engineer must
assure himself that the equipment is complete and intact. Should parts be damaged or
missing the carrier or ABB must be contacted.
It is recommended practice to photograph damaged equipment and send the photographs
to ABB and the carrier.
Checking the pre-conditions for commissioning
In order to ensure uncomplicated and efficient commissioning, it is important that converter
and associated equipment are ready for commissioning. The mechanical and electrical
installation should be done as described in the
ACS580MV Hardware Manual
(2UBB004520).
Reviewing and completing the items in the below list before the
commissioning engineer arrives on site will help achieve this.
11
FLUKE F80K-15
[Code: 3ABD00042166]
FLUKE Electronic
probe.
Refer to
ACS580MV
Hardware Manual
(2UBB004520)
12
USB to POF cable
[Code:2UBA011603R0002]
PEBB FW download
tool
13
Ethernet cable, 2.2M FTP
[Code:2UBA010631R0001]
Communication cable,
between PC and
Marshalling PLC.
No
Name
Pictures
Descriptions
Содержание ACS580MV
Страница 1: ... ABB INDUSTRIAL DRIVES ACS580MV Commissioning Manual 200kW to 6300 kW 3 3kV to 11 kV ...
Страница 4: ......
Страница 8: ...8 ...
Страница 43: ...Standard Commissioning Process 43 Press the button Load SW and wait till update is finished ...
Страница 45: ...Standard Commissioning Process 45 In this step should select Lab Tools Standalone Installation ...
Страница 60: ...60 Standard Commissioning Process Complete the installation press Finish ...
Страница 83: ...Standard Commissioning Process 83 ...
Страница 96: ...96 Standard Commissioning Process ...
Страница 121: ...Option 121 IO signals ...
Страница 122: ...122 Option Panel control interface System fault ...
Страница 140: ...140 Option ...
Страница 148: ...148 Preventive Maintenance ...