136 Option
Remote connectivity
Contents of this chapter
This chapter describes the installation and commissioning of remote service products. For
the drives with software version MHDRE v2.04.0.1 or higher, remote connection via NETA-
21 is possible.
Make the drive ready
Hardware connection
Step4
Stop set DI1=0
60.15 Force follower = True
19.11 Ext1/Ext2 selection =
EXT2
19.14 Ext2 control mode =
Speed
60.15 Force master = True
19.11 Ext1/Ext2 selection =
EXT1
19.12 Ext1 control mode =
Speed
60.15 Force follower = True
19.11 Ext1/Ext2 selection =
EXT2
19.14 Ext2 control mode =
Torque
Step5
BCU1 is follower
3.13 M/F or D2D ref 1 = 200
3.14 M/F or D2D ref 2 = 15
1.1 Motor speed used = 200
BCU2 is master
Start DI1=1, give load 15%
1.1 Motor speed used = 200
1.10 Motor torque = 15%
BCU3 is follower
3.13 M/F or D2D ref 1 = 200
3.14 M/F or D2D ref 2 = 15
1.10 Motor torque = 15%
BCU1:
BCU2:
BCU3:
Содержание ACS580MV
Страница 1: ... ABB INDUSTRIAL DRIVES ACS580MV Commissioning Manual 200kW to 6300 kW 3 3kV to 11 kV ...
Страница 4: ......
Страница 8: ...8 ...
Страница 43: ...Standard Commissioning Process 43 Press the button Load SW and wait till update is finished ...
Страница 45: ...Standard Commissioning Process 45 In this step should select Lab Tools Standalone Installation ...
Страница 60: ...60 Standard Commissioning Process Complete the installation press Finish ...
Страница 83: ...Standard Commissioning Process 83 ...
Страница 96: ...96 Standard Commissioning Process ...
Страница 121: ...Option 121 IO signals ...
Страница 122: ...122 Option Panel control interface System fault ...
Страница 140: ...140 Option ...
Страница 148: ...148 Preventive Maintenance ...