Quick installation and commissioning flowchart
Task
See
Identify the frame size of your drive: R0…R4.
Operation principle and hardware description
on page
Plan the installation: select the cables, etc.
Check the ambient conditions, ratings and
required cooling air flow.
Planning the electrical installation
on page
Unpack and check the drive.
:
on page
If the drive will be connected to an IT
(ungrounded) or corner-grounded system,
check that the internal EMC filter is not
connected.
Operation principle and hardware description
:
compatibility with IT (ungrounded) and corner-
Install the drive on a wall or in a cabinet.
on page
Route the cables.
Planning the electrical installation
on page
Check the insulation of the input cable and the
motor and the motor cable.
:
Connect the power cables.
:
on page
Connect the control cables.
:
on page
Check the installation.
Commission the drive.