
Quick installation and commissioning flowchart
See
Task
Type designation key (page 32)
Identify the frame size: R0, R1, R2, R3 or R4.
Guidelines for planning the electrical
installation (page 43)
Plan the installation.
Check the ambient conditions, ratings and required
cooling air flow.
Unpacking the delivery (page 39)
Unpack and check the drive.
Grounding system compatibility
check (page 63)
If the drive will be connected to an IT (ungrounded)
system, make sure that the internal EMC filter is not
connected.
Installing the drive (page 40)
Install the drive mechanically.
Route the cables.
Connecting the power
cables (page 68)
Connect the power cables.
Connecting the control
cables (page 71)
Connect the control cables.
Installation checklist (page 81)
Examine the installation.
Refer to
and start-up guide
(3AXD50000510344 [English])
, and
ACS180 Firmware manual
(3AXD50000467860 [English])
.
Commission the drive.
22 Introduction to the manual
Содержание ACS180-04S-03A7-1
Страница 1: ...ABB MACHINERY DRIVES ACS180 drives Hardware manual...
Страница 2: ......
Страница 4: ......
Страница 12: ...12...
Страница 24: ...24...
Страница 83: ...Make sure that The motor and the driven equipment are ready for power up Installation checklist 83...
Страница 84: ...84...
Страница 96: ...96...
Страница 146: ...146...
Страница 148: ...Frame R0 148 Dimension drawings...
Страница 149: ...Frame R1 Dimension drawings 149...
Страница 151: ...Frame R3 Dimension drawings 151...
Страница 152: ...Frame R4 152 Dimension drawings...
Страница 160: ...160...
Страница 180: ...Declarations of conformity 180 The Safe torque off function...
Страница 181: ...The Safe torque off function 181...
Страница 182: ...182 The Safe torque off function...
Страница 183: ...The Safe torque off function 183...
Страница 184: ...184...
Страница 187: ...Installation 1 2 N m M4x16 2x 3 3 3 2 2 2 2 Accessories 187...
Страница 189: ...Installation 3 3 2 2 2 3 2 2 N m M4x16 4x 1 Accessories 189...