ACS150 and ACS350
MUL1-R1 Installation instructions
© 2006 ABB Oy. All Rights Reserved.
3AFE68642868 Rev. D / 03.03.2006
2. Fasten the gland box frame to wall with four M4 screws
(not included).
1. Fasten the gland box frame to drive with two M4×12
screws.
1
2
WARNING!
Before installing MUL1-R1
option, read the safety instructions and
mechanical and electrical installation
instructions in the drive user’s manual.
Follow the instructions when installing,
operating and servicing the drive. If
ignored, physical injury or death may
follow, or damage may occur to the
drive, motor or driven equipment.
6
4
7
4. With FPBA-01 or FCAN-01 option modules, remove the
detachable lid (4) from the gland box cover.
5, 6, 7. With any fieldbus option module except FRSA-00,
remove the support plate (5), install the I/O clamping plate
(6) and the option grounding plate (7) to the gland box
frame. See
Mechanical installation
in the drive manual.
3a
3. Install clamps (3a) for control cables (see power cable
lead-throughs), or if cables are run in conduits, replace all
clamps with suitable glands (not included). Run cables
through the clamps and tighten. Strip cable ends. Fasten
the grounding conductor (PE) of the input power cable and
the twisted shield of motor cable under the grounding
clamps (3b). Connect the conductors to appropriate
terminals. See
Electrical installation
in the drive manual.
3b
5