
7.1
Safety
▲
DANGER
⚠
7.2
Overview of installation work
The electrical installation includes the following wire and cable connections:
- “7.5 Power cables, ground cables and equipotential bonding conductor” on page 93
- “7.6 Auxiliary power, control and serial communication cables” on page 102
7.3
Cable requirements
7.4
Ground cable connection and cable shield connections
The cabinet is equipped with a ground busbar (marked PE, Protective Earth) for grounding the
armor and shields of the cables, and for the connection of the ground cable.
Hazardous voltage!
- Improper work could lead to life-threatening injury or death.
- The electrical installation must be carried out by qualified personnel according
to the site and equipment requirements, and the relevant electrical codes.
- When the electrical installation is completed, the main and auxiliary power
supply to the drive must not be switched on without the consent of the ABB
commissioning personnel.
- Take appropriate measures to prevent main and auxiliary power supply being
switched on during installation.
For information on the requirements for power cables, ground cable and
equipotential bonding conductor, see:
- Power cable specification
- Power cables engineering guideline
For information on the requirements for the auxiliary power cable and the control
cables, see the “Auxiliary power and control cables guideline”.
To identify the ground bus, see “Appendix D – Wiring diagrams”.
Содержание ACS1000i air-cooled
Страница 1: ... MEDIUM VOLTAGE AC DRIVES ACS1000i air cooled User manual ...
Страница 3: ...Contents ACS1000i air cooled User manual ...
Страница 5: ... 01 About this manual 01 5 16 ...
Страница 16: ......
Страница 17: ... 02 Important safety information 02 17 28 ...
Страница 28: ......
Страница 29: ... 03 Power electronics and cabinet features03 29 56 ...
Страница 57: ... 04 Control system 04 57 70 ...
Страница 71: ... 05 Transportation storage and disposal05 71 78 ...
Страница 78: ......
Страница 79: ... 06 Mechanical installation 06 79 88 ...
Страница 88: ......
Страница 89: ... 07 Electrical installation07 89 104 ...
Страница 105: ... 08 Commissioning 08 105 110 ...
Страница 110: ......
Страница 111: ... 09 Operation 09 111 124 ...
Страница 125: ... 10 CDP control panel 10 125 148 ...
Страница 149: ... 11 Preventive and corrective maintenance 11 149 172 ...
Страница 173: ......