08 COMMISSIONING
3BHS206977 E01 REV H
ACS1000I AIR-COOLED
USER MANUAL
108/174
8.2
Commissioning checklist
This checklist is designed to help you prepare the drive and associated equipment
for commissioning.
8.2.1
Mechanical installation checklist
8.2.2
Electrical installation checklist
1.
Drive installed according to the instructions in this user manual
(3BHS206977 E01 Rev H).
□
2.
Drive securely fastened to the floor (if applicable)
□
3.
Fan units installed
□
4.
Visual inspection:
- No badly affixed or damaged components
- No foreign objects inside cabinet
- No dirt, dust and humidity inside cabinet
□
1.
Types and cross sections of control cables suitable for the signal type and
signal level
□
2.
Types and cross sections of power cables selected according to the instructions
in the power cable specification.
□
3.
Pulse encoder connected according to the relevant manual (only applicable for
drives with pulse encoder interface)
□
4.
Cable entry prepared according to the instructions in this user manual
(3BHS206977 E01 Rev H).
□
5.
All control cable screens and conductors are connected according to the
instructions of the user manual, appropriately labeled, and the customer-side
connections are completed
□
6.
Equipotential bonding conductor of drive securely connected at both ends
□
7.
Supply and motor cables not connected at both ends (cables and drive must be
insulation resistance tested (Megger test before connection)
□
Содержание ACS1000i air-cooled
Страница 1: ... MEDIUM VOLTAGE AC DRIVES ACS1000i air cooled User manual ...
Страница 3: ...Contents ACS1000i air cooled User manual ...
Страница 5: ... 01 About this manual 01 5 16 ...
Страница 16: ......
Страница 17: ... 02 Important safety information 02 17 28 ...
Страница 28: ......
Страница 29: ... 03 Power electronics and cabinet features03 29 56 ...
Страница 57: ... 04 Control system 04 57 70 ...
Страница 71: ... 05 Transportation storage and disposal05 71 78 ...
Страница 78: ......
Страница 79: ... 06 Mechanical installation 06 79 88 ...
Страница 88: ......
Страница 89: ... 07 Electrical installation07 89 104 ...
Страница 105: ... 08 Commissioning 08 105 110 ...
Страница 110: ......
Страница 111: ... 09 Operation 09 111 124 ...
Страница 125: ... 10 CDP control panel 10 125 148 ...
Страница 149: ... 11 Preventive and corrective maintenance 11 149 172 ...
Страница 173: ......