05 TRANSPORTATION, STORAGE AND DISPOSAL
3BHS213401 E01 REV H
ACS1000 AIR-COOLED
USER MANUAL
72/184
5.5
Storage
5.5.1
Storage conditions
The minimum requirements for storage are based on "IEC 60721-3-1 Classification of
environmental conditions: Classification of groups of environmental parameters and their
severities; Storage" [22].
Conditions: 1K22 / 1B1 / 1C2 / 1S11 / 1M11
5.5.1.1
Storage time
The drive can be stored for up to one year in the original packaging as long as it is not damaged
or opened.
5.5.2
Storing the drive
If the drive is taken out of service for a longer time proceed as follows:
1. Remove the batteries (if applicable).
2. Cover all cable inlets and ventilation slots with an impermeable plastic or aluminum foil and
a wooden panel.
3. Add a desiccant of the appropriate quality:
- 1 unit desiccant (30 g) absorbs 6 g water vapor.
Note:
The following quantity is needed when using a polyethylene foil:
- 10 units/m
2
foil
4. Close and lock the doors of the cabinet.
5. Use polyethylene or equivalent for packaging:
- 0,3 g/m
2
/24h water vapor diffusion
6. Attach humidity indicators to the packaging.
The storage conditions and the packaging should be checked regularly. Any damages that
occur during the storage period should be repaired immediately.
5.5.3
Storage and handling of spare parts
NOTICE
Check the spare parts immediately after receipt for damages. Report any damage to the
shipping company and the ABB service organization.
For information on longer storage periods, contact the ABB service organization.
Apply ESD handling precautions before handling these devices.
Electronic devices (eg, circuit boards, semiconductors) are sensitive to
electrostatic discharge (ESD), which can damage these devices.
Содержание ACS 1013-A1
Страница 1: ... MEDIUM VOLTAGE AC DRIVES ACS1000 air cooled User manual ...
Страница 3: ...Contents ACS1000 air cooled User manual ...
Страница 5: ... 01 About this manual 01 3 14 ...
Страница 16: ......
Страница 17: ... 02 Important safety information 02 15 26 ...
Страница 28: ......
Страница 29: ... 03 Power electronics and cabinet features03 27 50 ...
Страница 53: ... 04 Control system 04 51 66 ...
Страница 68: ......
Страница 69: ... 05 Transportation storage and disposal05 67 74 ...
Страница 76: ......
Страница 77: ... 06 Mechanical installation 06 75 82 ...
Страница 84: ......
Страница 85: ... 07 Electrical installation07 83 106 ...
Страница 108: ......
Страница 109: ... 08 Commissioning 08 107 112 ...
Страница 115: ... 09 Operation 09 113 126 ...
Страница 129: ... 10 CDP control panel 10 127 150 ...
Страница 153: ... 11 Preventive and corrective maintenance 11 151 182 ...
Страница 185: ......