ACQ550-U1 User’s Manual
11
Installation
Installation
Study these installation instructions carefully before proceeding.
Failure to observe
the warnings and instructions may cause a malfunction or personal hazard.
WARNING!
Before you begin read chapter
.
Note:
The installation must always be designed and made according to applicable
local laws and regulations. ABB does not assume any liability whatsoever for any
installation which breaches the local laws and/or other regulations. Furthermore, if
the recommendations given by ABB are not followed, the drive may experience
problems that the warranty does not cover.
Installation flow chart
The installation of the ACQ550 adjustable speed AC drive follows the outline below.
The steps must be carried out in the order shown. At the right of each step are
references to the detailed information needed for the correct installation of the drive.
Task
See
PREPARE
for installation
on page
PREPARE
the mounting location
REMOVE
the front cover
on page
MOUNT
the drive
on page
INSTALL
wiring
on page
and
on page
CHECK
installation
on page
REINSTALL
the cover
START-UP
on page
Содержание ACQ550-U1-011A-6
Страница 1: ...ACQ550 User s Manual ACQ550 U1 Drives 1 200 hp ...
Страница 4: ......
Страница 10: ...10 ACS550 U1 User s Manual Table of contents ...
Страница 42: ...42 ACQ550 U1 User s Manual Start up control with I O and ID Run ...
Страница 56: ...56 ACQ550 U1 User s Manual Control panel ...
Страница 68: ...68 ACQ550 U1 User s Manual Application macros ...
Страница 250: ...250 ACQ550 U1 User s Manual Fieldbus adapter ...
Страница 266: ...266 ACQ550 U1 User s Manual Maintenance ...
Страница 314: ...314 ACQ550 U1 User s Manual Index ...