
execute command
phase A
t1>tExecutionFB, then
long-operation-time in
'cause' is set
open
close
close
open
phase C
close
open
phase B
t1
tExecutionFB
timer
command termination
phase A
command termination
phase B
command termination
phase C
command termination
circuit breaker open
close
* The command termination will be delayed one execution sample.
*
en05000094_ansi.vsd
ANSI05000094 V1 EN
Figure 176:
tExecutionFB
The parameter
tSynchrocheck
is used to define the maximum allowed time between the
execute command and the input SYNC_OK to become true. If SYNC_OK=true at the
time the execute command signal is received, the timer "tSynchrocheck" will not start.
The start signal for the synchronizing is obtained if the synchronism-check conditions are
not fulfilled.
execute command
SY_INPRO
SYNC_OK
t2>tSynchronizing, then
blocked-by-synchronism
check in 'cause' is set
tSynchrocheck
t1
START_SY
tSynchronizing
t2
en05000095_ansi.vsd
ANSI05000095 V1 EN
Figure 177:
tSynchroCheck and tSynchronizing
Section 12
1MRK 502 048-UUS A
Control
376
Technical manual
Содержание 650 series
Страница 1: ...Relion 650 series Generator protection REG650 ANSI Technical manual ...
Страница 2: ......
Страница 44: ...38 ...
Страница 62: ...56 ...
Страница 68: ...62 ...
Страница 156: ...150 ...
Страница 198: ...192 ...
Страница 512: ...506 ...
Страница 644: ...638 ...
Страница 714: ...708 ...
Страница 777: ...771 ...