53
Installation
EN
6.2.8 Install the base - Terra 360
D
B
C
C
• Put thee base (A) on the foundation (B) and use it as a
drilling template
• Drill the 6 holes (C) in the foundation
• Use the bolts (D) to install the base on the foundation.
• Install the cable glands for each cable
NOTE
Make sure that the cables are fully guided
through the cable glands in the base and that
are correctly sealed.
6.2.9 AC cables preparation - Terra 360
NOTE
The length of the cable lug can change, depending on the model of the EVSE. Think about the
length of the cable lug when you calculate where to cut the cables.
A
D
C
X
X
X
E
• Cut the AC cables L1, L2 and L3 (B) to the correct length (X).
(X) = 210 mm is the distance between the cable gland
plate (C) and the center of thet connection terminal (A)
on the main switch (D).
• Attach the cable lugs to the cables. If two cables per
phase are used, make sure that you align the cable lugs
with the AC terminals before you attach the cable lug
Cable lug dimension
W
39 mm
W
H
H
20 mm
Hole
for a M12 bolt Ø13 mm
A
D
C
X
X
X
E
• Loosely close the cable ties on each AC cable
NOTE
The cable ties will be pulled after the
electrical connection of the AC cables on
the AC main switch.
F
• Screw the bolts (F) on the front side of the base to close
the cable inlets and seal the AC cables