4.7 Minimum oil-level in transformer
Oil spillage
Oil spillages that are not removed can be misstaken for oil-leakage at a later time, it is thus important to
remove them.
Procedure
1.
Make sure that the transformer oil-level is
maximum 30 mm from the lower side of the
bushing flange.
CAUTION!
A lower oil-level will reduce the
electrical insulation.
G006972
End of instruction
4.8 Installation of the outer terminal
Procedure
1.
Prepare the contact surface (47) and gasket
surface (87):
1.
Carefully clean the contact surface and
gasket surface with a soft cloth.
2.
Apply Vaseline to the contact surface.
3.
Apply Mobilgrease 28 to the gasket surface.
CAUTION!
Do not use a wire brush on the tin/zinc
coating (47).
G000403
Содержание 1ZSC902110-AAA
Страница 12: ...12 Installation and commissioning guide 1ZSC000563 AAF EN REV 4 2021 06 23 ...
Страница 18: ...18 Installation and commissioning guide 1ZSC000563 AAF EN REV 4 2021 06 23 ...
Страница 78: ...78 Installation and commissioning guide 1ZSC000563 AAF EN REV 4 2021 06 23 ...
Страница 82: ...82 Installation and commissioning guide 1ZSC000563 AAF EN REV 4 2021 06 23 ...