Publication No. SBC329-HRM/1
Configuration 23
3.4 Mezzanine Installation
, the SBC329 has one mezzanine site that supports a suitably
compliant XMC (including support for front-panel I/O).
CAUTION
The SBC329 does not provide a fully compliant XMC site; the front I/O keepout area defined in
the ANSI/VITA42 specification contains components. The maximum XMC component height in
that area must therefore be 8.0 mm.
Figure 3-2 Keepout Area
3.4.1
XMC Installation
XMCs supplied by Abaco are delivered with a full kit of parts for mounting them.
Fitting is described in the XMC Installation application note. An XMC ordered with
an SBC329 can be supplied fitted by Abaco, if required.
LINK
XMC Installation Application Note, publication number HN4/5-16.
It will usually be necessary to install driver software or implement other firmware
configuration to achieve full functionality of an XMC (see the specific XMC manual
for the exact procedure).
TIP
Where an XMC is not pre-installed, prove operation of the SBC329 before installing the XMC.