background image

26 

Aarrow Sherborne GSL CF

SERVICING

Step 7 

Clear inside of stove of any debris.

Step 8

To re-assemble reverse this procedure. See 

initial note on page 25.

Note:

When relocating the body and canopy

assembly ensure the front location tab is engaged
in the chassis.

BURNER AND  VALVE
ASSEMBLY REMOVAL

Please note! When handling the burner assembly
be aware of the sharp points of the self tapping
screws on the underside

Ensure the appliance is cold.

Step 1

Isolate the gas supply from the stove

Step 2

Disconnect the supply inlet pipe by    

releasing the pipe nut at the rear of the 
valve, see page 13.

Step 3

Remove the outer body of the stove (Ref 

Page 25).

Step 4

Remove the dummy fuel retainer and then

the glass frame assembly (Ref Page 25).

Step 5

Remove the coals or logs.

Step 6

Remove the base coal matrix (four pieces) 
Take care not to damage the matrix,
(Page 14).

Step 7

Remove the two self tapping screws each 
side of the injector as shown below.

The burner assembly may now be 
removed. Slide back off the injector and 
lift the burner assembly upwards from the
rear while at the same time pivoting it 
towards you. Take care not to damage the 
injector.

Step 8 

To remove the valve assembly undo the 
3x Pozi M5 screws, located within the fire
box (2x to the front of the burner and 1x 
centrually to the rear of the burner), lift 
upwards from the rear while at the same 
time pivoting it towards you. Carefully 
guide the controls through aperture clear 
of the stove. 

After replacement of burner assembly, ensure
that a check on the gas tightness of any new
joint is carried out.

Содержание Gas Stove

Страница 1: ...rne GSL Conventional Flue Gas Stove Installation Servicing Instructions User Manual PLEASE RETAIN THESE INSTRUCTIONS FOR FUTURE REFERENCE THIS STOVE IS NOT SUITABLE FOR TIMBER FRAMED PROPERTIES FOR US...

Страница 2: ...he Logs NG 15 16 Fitting Arranging The Logs LPG 16 17 Installation of Remote Control System 18 21 Commissioning The Stove 22 Fire Testing 22 23 Installation Check List 24 SERVICING Replacement Of The...

Страница 3: ...a heavy duty polythene bag and clearly labelled R C F waste This is not classified as hazardous waste and may be disposed of at a tipping site licensed for the disposal of industrial waste Protective...

Страница 4: ...d be fit for purpose be of suitable quality and workmanship and should comply with the applicable British Standard 9 Data Label Plate The data label plate is fixed to the underside of the valve bracke...

Страница 5: ...R BODY CANOPY FIRE DOORS VALVE COVER OPERATING INSTRUCTIONS CANOPY COVER PLATE CANOPY INFILL PIECE HOT PLATE BLANKING FLUE SPIGOT OPERATING TOOL CONTENTS LIST Fig 2b Canopy Cover Plate Canopy Infill P...

Страница 6: ...erated if the glass is cracked or broken Warning If it is known or suspected that an operational or ignition fault exists on the appliance it must not be used until it has been investigated and correc...

Страница 7: ...d these Installation Instructions Warning Failure to comply with the regulations requirements or these instructions will invalidate the guarantee and could have hazardous consequences IMPORTANT Please...

Страница 8: ...he rear of the stove is to be 100mm from the wall which must be of a non com bustible material The hearth must not be capable of inadvertent covering by a carpet or rug This should be achieved by eith...

Страница 9: ...le material is shown on graph 1 Non Combustible shelf clearances The minimum height from the extreme top surface of the stove to the underside of a shelf or other projection made of non combustible ma...

Страница 10: ...Regulation Requirements and BS 5440 Part 1 Suitable types of chimney include the following Masonry chimney built with clay or concrete lin ers or a chimney block system meeting Building Regulations P...

Страница 11: ...l a T section with debris soot collector directly into the flue spigot Ensure it passes through the closure plate by at least 102mm 4 The maximum horizontal section allowed is 350mm Provide a minimum...

Страница 12: ...12 Aarrow Sherborne GSL CF INSTALLATION INSTRUCTIONS Fig 6b Fig 6a Fig 6c Y See Graph 1...

Страница 13: ...er This must be carried out with all other gas appliances operating at maximum To check the pressure to the burner it is necessary to ignite the appliance and set to high rate See pressure test sequen...

Страница 14: ...and the front of the fire box These matrices are labelled LF left front RF right front The RF matrix has a notch in the front to avoid the pilot assembly The arrangement should look like Fig 10a 3 Now...

Страница 15: ...rix in the centre at the rear of the burner The base of the matrix should slot down behind the burner See Fig 12a 2 Lay the Y shape log to the right hand side of the burner Ensure that the Y open sect...

Страница 16: ...e they are handled carefully Ensure location is correct Do not force the matrix into position If any of the logs and or rear matrix is damaged they must be replaced with genuine Aarrow parts Warning A...

Страница 17: ...orners of the burner See Fig 14b 4 Next place the 2x large twigs into the layout with the base of each twig central about the stove opening and placed to the front of the stove The tops of these twigs...

Страница 18: ...rol system PARTS LIST 1 Motor 2 Ultrasonic Receiver 3 Remote control handset 4 Wiring Harness Multiblock end to reciever spade connections to motor micro switch 5 Micro switch 6 AA LR6 1 5v Batteries...

Страница 19: ...he drive gear onto knob B arrow Y 4 Replace valve cover ensure clip is located before the pozi screw is tightened Do not over tighten the screw as this may effect the operation of the control 5 Take t...

Страница 20: ...e Fig 17b 3 Place the double sided adhesive tape to the underside of the reciever unit Slide back the cover and insert the 4x AA LR6 1 5v batteries into unit observing the correct polartity as marked...

Страница 21: ...remote is now ready to use In the event of battery failure the flame height can still be adjusted man ually using the knob B on the valve NOTE Please note the placement of the Remote control temperat...

Страница 22: ...not occur the appliance must be disconnected and the flue checked Step 5 If there is an extractor fan in any room this must be turned on and any doors between it and the fire left open repeat the spi...

Страница 23: ...second will cut the stove off if there is inadequate flue draw for example a blockage in the chimney If this occurs the stove should not be re lit until the stove and flue have been checked by a quali...

Страница 24: ...gas appliances only c If clay or concrete flue liners used confirm that they are correctly jointed with socket end uppermost and state jointing materials used d If an existing chimney has been refurb...

Страница 25: ...rs one per side Step 4 Lift the body and canopy off the chassis Refer to guide to manual handling on page 3 Step 5 Remove dummy fuel retainer 2 screws If glass is broken suitable gloves must be worn f...

Страница 26: ...tainer and then the glass frame assembly Ref Page 25 Step 5 Remove the coals or logs Step 6 Remove the base coal matrix four pieces Take care not to damage the matrix Page 14 Step 7 Remove the two sel...

Страница 27: ...ve check that it is clear of any debris or obstructions Step 10 Check the system for gas soundness Step 11 Check the ignition of the pilot and with the pilot turned off check that the flame failure sy...

Страница 28: ...onto thermocouple Replace the pilot OSD assembly No No No Turn gas on Purge system Yes Correct pressure No Replace pilot assembly OSD No Yes Check for spark output from control valve Yes Check if gas...

Страница 29: ...al please contact your Aarrow stove retailer Please keep all repair receipts safely Please ensure you have this manual available when an engineer visits as they will complete the service record chart...

Страница 30: ...30 Aarrow Sherborne GSL CF ADDITIONAL NOTES...

Страница 31: ...USER INSTRUCTIONS Aarrow Sherborne GSL CF 31...

Страница 32: ...20b Continue pressing down while turning knob A anti clockwise to the small flame position this will activate the piezo and light the pilot Continue to hold down for a further 10 seconds after pilot...

Страница 33: ...nitial firing the stove will give off non toxic fumes when first used This is perfectly normal and will disappear after the first few hours It is advised to ventilate the room by opening doors and win...

Страница 34: ...ncremental change in flame height Note In the event of battery failure the flame height can still be adjusted manually Caution It is recommended to turn the combination control either to the off or pi...

Страница 35: ...ess AUTO until the display flashes Press A or B to the desired temperature Wait or press AUTO to switch to automatic mode A sensor in the remote control measures the room temperature The controller co...

Страница 36: ...ogramme turns to P1 or P2 heating cycle off the motor will turn the valve to pilot and there is no temperature control This minimizes battery consumption You may press AUTO to verify the set temperatu...

Страница 37: ...could block the motor when the knob reaches the end points of its turning radius The knob must then be turned manu ally to free blockage The temperature is controlled by activating the motor for a spe...

Страница 38: ...rning If it is known or suspected that an operational or ignition fault exists on the appliance it must not be used until it has been investigated and corrected by a qualified gas engineer Warning The...

Страница 39: ...stible material is shown on graph 1 Non Combustible shelf clearances The minimum height from the extreme top surface of the stove to the underside of a shelf or other projection made of non combustibl...

Страница 40: ...124 AFGS1087 AFGS1125 AFGS1126 3 Log set LPG Complete 4 Injector NG BRAY 82 400 5 Injector LPG BRAY 82 160 6 Pilot assembly NG 7 Pilot assembly LPG 8 Top Burner Assembly NG Part Description Visual Aid...

Страница 41: ...089 AFGS1128 AFGS1093 AFS047 AFGS1118 AFGS1095 AFGS1096 11 Fire door set with handles 12 Glass Frame Assembly 13 Hinge Kit With Fixings 14 Dummy Fuel Retainer 15 Instruction Manual 16 Stove Glass Rope...

Страница 42: ...art Description Visual Aid not to scale Part Number AFGS1120 18 Top Flue Infill Piece AFGS1119 19 Valve Cover AFGS1129 20 Flue Spigot Complete With Rope Gasket AFGS010 21 Hot Plate Complete With Rope...

Страница 43: ...nction Note Pilot must be lit manually before function of remote control is operational Paint Matching aerosol paint to tone in any connecting flues pipes or surrounding metalwork Tracery Gothic style...

Страница 44: ...llation Check List on page 24 The stove must also be serviced in accordance with these instructions and the record of Annual service on page 29 should be completed by your service engineer USE OF SPAR...

Страница 45: ...Aarrow Sherborne GSL CF 45 ADDITIONAL NOTES...

Страница 46: ...STRATION CARD GAS SERVICE TAP 8x GLASS FIXING SCREWS HOT PLATE FLUE SPIGOT OUTLET OUTER SLAB CANOPY COVER OUTER SLAB CANOPY INFILL FIRE DOORS HANDLES OUTER BODY ASSEMBLY DUMMY FUEL RETAINER VALVE COVE...

Отзывы: