Aarrow Sherborne GSL CF
25
SERVICING
REPLACEMENT OF THE GLASS
IMPORTANT
When refitting the glass frame ensure the origi-
nal screws are used. Longer screws may foul
the coal / log set placement.
Ensure the appliance is cold.
Step 1a
For rear flue appliance remove canopy
cover plate.
Step 1b
For top flue appliance remove infill piece.
Step 2
Remove the fire doors
Open and lift off hinges (held shut by magnet).
Step 3
Disengage locking levers, one per side.
Step 4
Lift the body and canopy off the chassis.
Refer to “guide to manual handling” on page 3.
Step 5
Remove dummy fuel retainer (2 screws)
If glass is broken, suitable gloves must be worn
for protection.
Step 6
Remove glass and glass frame.
• Remove any loose glass
• Be aware of any glass that will become loose
when removing the frame.
•Loosen but do not remove the four screws at the
base of the frame.
•Remove all but one of the top centre retaining
screws.
•Remove the remaining top screw. The frame and
glass will now be loose and can be removed.
•The frame has slots at the base to ease removal.
•Remove any remaining loose glass.