background image

The Becton 

MK 2

Range of Gas Stoves

Operating & Installation Manual

PLEASE RETAIN THESE INSTRUCTIONS FOR FUTURE REFERENCE

FOR USE IN COUNTRIES

GB & IE

Rev 9            

(Becton 7 With Add On Canopy)

Содержание Becton MK 2

Страница 1: ...The Becton MK 2 Range of Gas Stoves Operating Installation Manual PLEASE RETAIN THESE INSTRUCTIONS FOR FUTURE REFERENCE FOR USE IN COUNTRIES GB IE Rev 9 Becton 7 With Add On Canopy ...

Страница 2: ... of our product that we offer a Lifetime Guarantee Should you have any questions about our Becton Stoves that are not covered in this manual please contact the Aarrow dealer in your area or call our Technical support department on 01308 427234 Flaming Good Fires Becton Bunny Becton 7 MK2 Gas stoves COPYRIGHT September 2002 Aarrow Fires Ltd This booklet has copyright may not be copied in whole or p...

Страница 3: ...re Test Sequence 14 Fire Testing 15 Installation Check List 16 Page SERVICING Details of Pilot Assembly 17 Glass Trim Fitting 18 Component Replacement 19 Replacement of the Door Seal 19 Regular Service 19 Annual Service 20 Cleaning Outer Services 19 Cleaning Door Glass 20 Fault Diagnosis 21 SPARE PARTS General Components 22 Accessories and Options 22 Spare Parts List 25 28 GUARANTEE Lifetime Guara...

Страница 4: ...other debris accumulated in and around the appliance This should be performed before and after the installation It is recommended that any replacement item s are not broken up but sealed within a heavy duty polythene bag and clearly labelled R C F waste This is not classified as hazardous waste and may be disposed of at a tipping site licensed for the disposal of industrial waste Protective clothi...

Страница 5: ... except the control knob the control door handle and control door are considered to be working surfaces Warning Under no circumstances must the fire be operated with the door open or if the glass is cracked or broken Warning If it is known or suspected that an operational or ignition fault exists on the appliance it must not be used until it has been investigated and corrected by a qualified gas e...

Страница 6: ... panels are pointing towards the centre of the fire Once the reflective panels are fitted arrange the coals See Arranging the coals Category I2H For use in GB and IE at a supply pressure of 20mbar TECHNICAL DATA Becton Bunny Natural Gas Becton 7 Natural Gas Main Burner Injector Max Heat Setting Heat Input net 3 3 kW 4 2 kW Heat Output net Gas Rate 0 349 m3 hour 0 444 m3 hour Cold Setting Pressure ...

Страница 7: ... centrally between the end tabs of the location bar Fig 3a Fig 3a Step 2 Place the rear matrix cut out section over the base matrix and centralise the assembly between the end tabs of the location bar Ensure the rear matrix is pushed back against the location bar Fig 3b Fig 3b Step 3 Locate 2 off end coals each side of the base matrix See underside of coals for hand identification Fig 3c Fig 3c St...

Страница 8: ...4b Fig 4b Step 1c Keep the control knob pressed in for a further 15 seconds and then release The pilot will remain alight If pilot does not remain alight repeat this procedure Please note that when purging the gas supply it is usual to have to keep the control knob depressed in the spark position for longer periods of time Step 2 To ignite the main burner rotate the control knob anti clockwise to ...

Страница 9: ...e to re light the gas for at least three minutes To restart the fire turn the control knob to the off position and repeat the lighting controlling the fire instructions The flame failure device is a safety feature required by law and must not be put out of action by the installer If this device or any of its parts are to be replaced only original manufacturer s parts are to be used Repeated operat...

Страница 10: ...y Engineer telephone 0800 0924019 www nace org uk or NACS National Association of Chimney Sweeps telephone 01785 811732 www chimneyworks co uk The Bunny requires a minimum flue system of 101mm diameter 4 inches The Becton 7 requires a minimum flue system of 127mm diameter 5 inches The minimum effective height of the chimney must be 3 metres it must be terminated with a suitable chimney pot or cowl...

Страница 11: ...ue extension passes through the hole in the closure plate Ensure all joints are suitably sealed See figure 6c Top Flue Provide a minimum vertical height of 600mm of flue measured from the top of the appliance See figure 6d Move the fire with flue spigot in place into position under the flue and seal the spigot flue connection with fire cement Ref fig 5c It is recommended that a smoke test is perfo...

Страница 12: ...e to any combustible shelf Fig 6a See Graph 1 There must be a minimum of 230mm from the rear of the fire to any combustible back wall Fig 6a With a Non combustible back wall the fire can be pushed back until the top diverter touches the wall although to improve access and air circulation a minimum distance of 100 mm is recommended Reference non combustible side walls a minimum of 100mm is recommen...

Страница 13: ...er projection made of wood or any other combustible material is shown on graph 1 Graph 1 Combustible Shelf Clearances The recommended minimum height from the extreme top surface of the fire to the underside of a non combustible shelf is 100mm Becton Bunny Becton 7 MK2 Gas stoves 13 INSTALLATION ...

Страница 14: ...the 1 4 BSP nut and olive with 8mm tubing A maximum pipe run of 1 5 meters or 5 feet should be adhered to and copper tubing may be used provided a distance of 25mm is maintained between pipe work and any surface of the fire A gas service cock should be fitted adjacent to the fireplace to enable safe removal of the appliance for servicing After fitting the supply operate the gas cock supplied and c...

Страница 15: ...ccur the appliance must be disconnected and the flue checked Step 5 If there is an extractor fan in any room this must be turned on and any doors between it and the fire left open repeat the spillage test Repeated operation of the spillage monitoring system indicates that there maybe a flue draw problem In this situation no more attempts at operating the appliance should take place and your gas en...

Страница 16: ...draught gas appliances only c If clay or concrete flue liners used confirm that they are correctly jointed with socket end uppermost and state jointing materials used d If an existing chimney has been refurbished with a new liner type or make of liner fitted e Details of flue outlet terminal and diagram reference Outlet Details Complies with f Number and angle of bends g Provision for cleaning and...

Страница 17: ...y This will keep the fire and its components including the ceramic coal set in a warmer state and give instant ignition to the burner This in turn will reduce condensation in the chimney and any flue problems associated with this Fig 9 Becton Bunny Becton 7 MK2 Gas stoves 17 SERVICING ...

Страница 18: ... GLASS If necessary the glass can be removed as follows Step 1 Remove the brushed steel finish trim by pressing on the curved edge at the top until the trim can be disengaged from the lugs Step 2 Slide the two glass retainer clips on one side only inwards towards the centre of the door as far as they will go Step 3 Pull this side of the glass away from the door casting easing the tags on the glass...

Страница 19: ...old adhesive using a wire brush ensuring that the surface is clean and dust free Reference the Bunny Record the pattern of the sealing strips Step 3 Apply the new adhesive to the door casting Step 4a Becton 7 Starting at one end press the new door seal into the adhesive continue around the door making sure that the two ends of the seal are touching Cut off any excess seal Step 4b Becton Bunny Rela...

Страница 20: ...escribed in arranging the coals Step 9 Carry out spillage test as per instructions on page 15 CLEANING OUTER SURFACES To clean the outside first the appliance must be cold The outside finish of the fire is a durable high temperature paint this will give off a slight odour during the first few days of operation It is best cleaned by using a soft brush Do not allow moisture to remain on the fire whi...

Страница 21: ... Is the thermocouple o k No Is the flue blocked Carry out smoke test Is their a spark at the electrode No Is pilot injector obstructed Clean No No No Turn gas on Purge system Yes Correct pressure No Correct alignment or replace No Yes Check piezo igniter Yes Check to ensure the pilot assy is not obstructed or faulty Yes No Has spillage monitoring system been activated Yes Investigate flue systems ...

Страница 22: ...dition of a stand increases the height of the flue by approximately 105mm Paint Matching aerosol paint to tone in any connecting flues pipes or surrounding metalwork Add on Canopies Bunny Low available only Size 405mm wide x 335mm deep Raises the fire approximately 150mm Becton 7 High and low are available Size 475mm wide x 345mm deep High Raises the fire approximately 240mm Low Raises the fire ap...

Страница 23: ...Becton Bunny Becton 7 MK2 Gas stoves 23 NOTES ...

Страница 24: ...24 Becton Bunny Becton 7 MK2 Gas stoves NOTES ...

Страница 25: ...GS090 AFS090 AFS091A AFS091 AFS1042 AFS1042 AFS047 AFS047 1a Becton Bunny Mk 2 Coal Set 2 Co pilot Assembly 3 Elbow Injector 4 Gas Control Valve 5 Control Door Magnet 6 Hinge Kit To Fit Both Doors Comprises 2 Hinges 4 Fixings Per Set Part Description Visual Aid not to scale Bunny Mk 2 Part No Becton 7 Mk2 Part No ...

Страница 26: ...095 AFGS097 AFGS037A AFS069 AFS088 8 Control Door Handle Assembly 9 Burner Fixing 10 Pipe Set Complete With Connectors 11 Decorative Door Surround 12 Main Door Assembly Complete With Handle Glass Gaskets Clips and Seal 13 Glass Replacement Kit Complete With Glass Gaskets Clips Part Description Visual Aid not to scale Bunny Mk 2 Part No Becton 7 Mk 2 Part No ...

Страница 27: ...AFGS099 15 Hotplate 16 Flue Outlet Spigot 17 Becton 7 Mk 2 Gas Fire Door Rope Kit With Door Rope Glue 18 Becton Bunny Mk 2 Fire Door Rope Kit With Door Rope Glue 19 Becton Bunny Mk 2 Reflective Panels 19a Becton 7 Mk 2 Reflective Panels Part Description Visual Aid not to scale Bunny Mk 2 Part No Becton 7 Part No AFGS082 AFGS062 ...

Страница 28: ...Becton 7 MK2 Gas stoves SPARE PARTS 20 Large Ceramic Panel AFGS093 AFGS093 AFGS094 AFGS094 AFGS025 AFGS025 21 Small Ceramic Panel 22 Gas Tap Part Description Visual Aid not to scale Bunny Mk 2 Part No Becton 7 Part No ...

Страница 29: ...be final If your appliance proves to be defective as a result of faulty materials or workmanship during guarantee we will repair or replace it FREE OF CHARGE as long as the fire has been installed according to the these instruction and by a CORGI Registered fitter who has completed and signed the Installation Check List on page 16 The fire must also be serviced in accordance with these instruction...

Страница 30: ...al please contact your Aarrow retailer Please keep all repair receipts safely Please ensure you have this manual available when an engineer visits as they will complete the service record chart 30 Becton Bunny Becton 7 MK2 Gas stoves SERVICE RECORD Date of Visit Company Work Carried Out Signature ...

Страница 31: ...ment Documentation must be retained and produced in the event of a warranty claim This guarantee specifically does not cover accidental damage misuse wear tear The use of non Aarrow replacement parts will invalidate your warranty For full details contact your local Aarrow dealer All guarantees are in addition to your statutory rights Please see page 29 for further information regarding the guarant...

Страница 32: ... installer completes INSTALLATION CHECK LIST details on page 16 of this manual Please ensure the enclosed registration card is completed and returned to Aarrow Fires and the following information completed for your own information QUALITY FINISH COAL SET REGISTRATION CARD REFLECTIVE PANELS DOOR HANDLE FLUE OUTLET HOTPLATE OPERATING INSTRUCTIONS GAS COCK ...

Отзывы: