INSTALLATION
Assembly (Continued)
34.
Once the install and cable adjustment has been completed, check the
synchronisation of the locks with a vehicle on the hoist. If necessary re-
adjust the cables.
Please note: as the hoist cables have a settling in
period, cable adjustment will be required after a certain amount of use.
35.
Place the post caps on top of all posts.
Assembly Pictures
Picture 1
Picture 2
Picture 3
Picture 4
Picture 5
Picture 6
Picture 7
Chamfer
15
Содержание AL-4000A
Страница 10: ...Dimensions AL 4000S2 9 ...
Страница 18: ...Parts List 17 ...
Страница 19: ...18 ...
Страница 25: ...Air Line Diagram 24 ...
Страница 26: ...Electric motor jumper pins 25 ...
Страница 27: ...26 ...
Страница 28: ...27 ...
Страница 29: ...How to operate Jack 28 ...