
81
Aluminum Energy Recovery Wheel
This section is provided to assure the energy
recovery feature will be properly setup to
perform in accordance with
the job
specifications for your particular application.
Figure 48 - Aluminum Energy Recovery Wheel
1.
Monolith energy recovery wheel
2.
Purge Sector
3.
Profile
4.
Motor
5.
Brush Plate
6.
Rotor Hub
7.
Casing
Aluminum Wheel Check Purge Location
The purge sector is an optional element so it
may not be installed on some units. Ensure
the purge sector is mounted in the correct
location. Purge sector must be located on the
fresh supply air side. Based on the airflow
and the wheel rotation in the following
illustrations, notice the correct locations for
the purge sector.
Figure 49 - Aluminum ERW Purge
Sector Location
Aluminum Wheel Air Seals
Both
non-contact
sealing
on
wheel
peripheries and brush sealing middle beam
are maintenance-free but their condition must
be checked every year. During the inspection,
check their tightness and overall visual
condition. Non-contact seals must not be
flipped, rolled or pierced at any place
If seals are damaged, please contact our
technical support immediately. A damaged
Содержание RN Series
Страница 2: ......
Страница 32: ...32 Figure 5 RN Series 6 8 and 10 ton Unit Isolator Locations ...
Страница 33: ...33 Figure 6 RN Series 9 and 11 15 ton Unit Isolator Locations ...
Страница 34: ...34 Figure 7 RN Series 16 25 and 30 ton Unit Isolator Locations ...
Страница 35: ...35 Figure 8 RN Series 26 31 50 60 and 70 ton Unit Isolator Locations ...
Страница 36: ...36 Figure 9 Steel Mounting ...
Страница 102: ...102 Figure 56 Example 6 50 60 70 ton through the Base Gas Piping ...
Страница 105: ...105 Gas Heater Operating Instructions Figure 58 Gas Heater Instructions ...
Страница 129: ...Maintenance Log E Coated Coil ...