Chapter 2
–
Hardware Information
10
Ed
ge
Sy
stem
UPN
-E
DG
E-
EHL01
-F
DK
UP
Sq
ua
red
6
00
0 E
dg
e
Co
mp
utin
g K
it
2.3.3
M.2 Key-B Slot (CN35)
Pin
Signal
Pin Signal
Pin Signal
1
NC
2
+3.3V
3
GND
4
+3.3V
5
GND
6
FULL_CARD_POWER_OFF#
7
8
W_DISABLE#1
9
USB2_D-
10
NC
11
GND
12
NC
13
NC
14
NC
15
NC
16
NC
17
NC
18
NC
19
NC
20
NC
21
NC
22
NC
23
NC
24
NC
25
NC
26
NC
27
GND
28
NC
29
USB3_RX-
30
UIM_RST
31
32
UIM_CLK
33
GND
34
UIM_DAT
35
USB3_PX-
36
UIM_PWR
37
38
NC
39
GND
40
NC
41
PCIE10_RXN
42
NC
43
PCIE_RXP
44
NC
45
GND
46
NC
47
PCIE_TXN
48
NC
49
PCIE10_TXP
50
PLT_RST#(3.3V)
51
GND
52
PCIE_CLKREQ#
53
PCIE_CLKN
54
PCIE_WAKE#
55
PCIE_CLKP
56
NC
57
GND
Содержание UP Squared 6000 Edge Computing Kit
Страница 13: ...Edge System UPN EDGE EHL01 FDK UP Squared 6000 Edge Computing Kit Chapter 1 Chapter 1 Product Specifications...
Страница 16: ...Edge System UPN EDGE EHL01 FDK UP Squared 6000 Edge Computing Kit Chapter 2 Chapter 2 Hardware Information...
Страница 19: ...Chapter 2 Hardware Information 7 Edge System UPN EDGE EHL01 FDK UP Squared 6000 Edge Computing Kit Bottom...
Страница 42: ...Chapter 2 Hardware Information 30 Edge System UPN EDGE EHL01 FDK UP Squared 6000 Edge Computing Kit Bottom...
Страница 55: ...Edge System UPN EDGE EHL01 FDK UP Squared 6000 Edge Computing Kit Chapter 3 Chapter 3 Software Installation...
Страница 58: ...Edge System UPN EDGE EHL01 FDK UP Squared 6000 Edge Computing Kit Appendix A Appendix A Cables and Connectors...