7
Note:
Steps 1 through 7 shown above is applicable
for models EWSH PLUS - 15 and EWSH PLUS - 25.
Similar steps needs to be followed for
EWSH PLUS 15 - LHS and EWSH PLUS 25 - LHS.
Call A. O. Smith Customer Care for additional
details and support.
Conversion From Wall Mounting Installation To Floor Mounting
Step 2: Unscrew the four bolts, and remove
the two brackets
Step 3: Turn 90 degrees and remove four paper
disks
Step 4: Place the paper disks to cover the holes
on the jacket
Step 1: Factory default installation (wall hung)
Step 5: Use four screws (accessories) to fix
the two brackets in place
Step 7: Floor installation
Warning:
The water heater comes with default wall hung
installation. The same should not be used for
floor mounting. Separate floor mounting
accessories have been provided for floor
mounting option.
Step 6: Assembly finished depiction