ENGLISH
7
4
INSTALLATION
ATTENTION:
IMPORTANT INSTRUCTIONS FOR SAFE INSTALLATION.
OBSERVE ALL INSTRUCTIONS, INCORRECT INSTALLATION
CAN LEAD TO SERIOUS INJURY.
4.1
Checking and preparing the gate/gate system
WARNING!
Risk of injury from gate system faults!
A fault in the gate system or an improperly aligned gate can
lead to serious injury.
►
Do not use the gate system if repair or adjustment work
needs to be performed.
►
Check the entire gate system (hinges, gate mounting and
fasteners) for wear and potential damage.
►
Check for rust, corrosion or cracks.
The sliding opener is not designed for operating sluggish/stiff
gates, i.e. gates which cannot be opened or closed by hand, or
only with diffi culty.
The opener is only suitable for gates which do not exhibit
gradients or slopes.
The gate must be mechanically sound so that it can be easily
operated by hand (EN 12604).
►
Check that the gate can be opened and closed properly.
►
Put mechanical gate locks which are not required for operation
with a sliding opener out of operation. This includes, in
particular, the locking mechanisms of the gate lock.
►
Secure the gate mechanically to prevent it from overrunning
its guides.
4.2
Installing the sliding opener
WARNING!
Risk of injury from unintentional gate movement
In the event of improper installation or operation of the opener,
unintentional gate movements may be triggered which
may cause people or objects to become trapped.
►
Follow all instructions contained in this manual. Danger
of crushing and shearing! Never grab hold of the main or
secondary closing edges when the gate is moving!
4.2.1 Foundation for the sliding opener
ATTENTION!
Faults in the control lines
Control lines and supply lines routed together can lead to
malfunctions.
►
Route the control lines of the opener (24 V DC) in a separate
installation system to the supply lines (230/240 V AC).
• A foundation must be cast for the sliding opener, as shown in
Figure 1. The marking
indicates the frost-free depth
(in Germany = 80 cm).
• Concrete ≥ B25/C25 (compacted) is required.
• Gates with interior rollers may require a plinth foundation.
• The 230/240 V mains supply line must pass through an empty
conduit in the foundation. The supply line for connection of
24 V accessories must past through a separate empty conduit
separated from the mains supply line.
m
min. 550
min. 350
min. 225
A
24 V
230/240 V~
50 Hz
NYY-I 3 x 1,5 mm
2
1
Figure 1 - Foundation
4.2.2 Inserting the base plate
Prepare the concrete foundation in accordance with the
installation dimensions. Secure the ground anchor in the holes
in the metal base plate and insert into the cement surface.
Always observe the installation dimensions! See
“Figure 1 -
Foundation”
and
“Figure 2 - Ground anchor”.
The attachment base must be completely level and clean over its
entire length.
The screw threads of the fl oor anchor, as well as the empty
conduits/cables for electrical connection, must protrude fully.
WARNING!
Unsuitable fi xing materials
Use of unsuitable fi xing materials can lead to the opener being
insecure and coming loose.
• The installer must verify the suitability of the supplied
installation materials for the installation location.
Содержание CX1024
Страница 1: ...www 4ddoors com au instructions for fitting operating and maintenance Sliding operator CX1024 ...
Страница 2: ...2 A B Ø 12 mm Ø 5 5 mm 17 mm 3 mm 2 17 5 mm 3 mm PIC 01 ...
Страница 12: ...ENGLISH 12 DX SX DX SX 11 Figure 11 End positions Max 38 mm 102 mm 12 Figure 12 Distances ...
Страница 37: ...ENGLISH 37 ...
Страница 42: ...2906380 www 4ddoors com au instructions for fitting operating and maintenance Sliding operator CX1024 ...