10
Take Apart
Before You Start
1.
Read these instructions completely before you start.
2.
Strictly follow all instructions.
3.
Pay attention to all warnings.
Tools to prepare
•
1 Screwdriver
Preparation
•
To protect POS Chassis and display, please carefully place the POS terminal on a
flat and clean surface.
•
Prepare additional cushioned material (for example: soft, clean, and flat pearl
cotton).
•
Terminate the application running in the POS Terminal and shut down the
operation system.
•
Turn off the power of peripherals (for example: Thermal Receipt Printer).
•
Disconnect peripherals.
•
Disconnect the power adaptor from the POS terminal.
Warning:
•
DO NOT retrofit any parts of POS Terminals or use non-qualified parts or
components.
•
Keep the disassembled parts, cables, devices, and screws in good condition.
•
For maintenance or replacement, please consult the technicians of your supplier
before you start.
Содержание PTE0605
Страница 1: ...1 All In One POS Systems Intel J6412 USER MANUAL PTE0605...
Страница 4: ...4 POS Section Views Picture 02...
Страница 5: ...5 Internal Quick View Picture 03 Chassis Details Picture 04...
Страница 12: ...12 3 Take out the 2 5 Hard Drive from the Hard Drive Slot Picture 28 Picture 29...
Страница 15: ...15 Customer Display 1 Unplug the VGA from the I O Ports Panel Picture 18 Picture 19...